Nevada Department of Transportation
Home MenuDocuments
- 040-089A Visual Audit Nuke Density Gauge - Soils
- 040-091 Audit Report In-Place Density
- TONNAGE ITEMS SPREADSHEET BY CUTOFF DATE INSTRUCTIONS
- TONNAGE ITEMS SPREADSHEET BY CUTOFF DATE
- 040-028 Safety Checklist Contractors Operation
- Prepave PCCP
- Prepave PBS
- Bridge Pre-Pour Agenda strs
- 040-056B Work Zone Traffic Control Checklist
- 040-012 Contractor Traffic Log
- Weekly Trainee Report (Electronic)
- Suspension Letter 041420
- Risk Reserve Expenditure (Electronic)
- Resumption Letter 041420
- Precon Agenda Template_2023 Update
- NDA - Highway Job Resident Engineer Checklist (V06)
- LDs for Liquid and Emulsified Asphalts (Electronic)
- LDs for Asphalt Cement (Electronic)
- LD Worksheet for Lottman (Electronic)
- LD Worksheet for Asphalt Cement (Electronic)
- Invoice Recap Tracking Sheet
- Force Account Recap (Electronic)
- FHWA Pre-Authorization (Electronic)
- Equip Watch Recap (Electronic)
- EDOC Crew Checklist for Field Closeout with AWP Materials (06-2022)
- EDOC Crew Checklist for Field Closeout (04-2022)
- District relief of maint
- District Acceptance
- Cost Analysis (Electronic)
- Conflict Resolution Form, electronic
- Calc Sheet 040-034
- Bridge Pre-Pour Agenda strs
- Bill of Lading Calc Sheet (Electronic)
- 040-090 Dispute Process Documentation Worksheet
- 040-089 Visual Audit Report Form
- 040-088 Daily Biological Field Report (Electronic)
- 040-087 Material Deposit Usage Report
- 040-086 Nuclear Personnel Inspection
- 040-085 Field Lab Inspection
- 040-084 Ride Adjustment Columnar Sheet Rev. 7-20
- 040-081 Calibration of Unit Weight Measure
- 040-079 Visual Audit Report Form
- 040-074 Equipment Repair Form Utilized by the I.A.Lab
- 040-072 Report Form for Two-Way or Three-Way Audits
- 040-071 Audit Report Form for Concrete Tests
- 040-070 Audit Report Form for Concrete Aggregates
- 040-068 Sand Density Calculation
- 040-067 Water Volume Calculations for Sand Cone Apparatus and Measuring Vessel (Hat)
- 040-064 Pavement Core Record
- 040-061 Drilled Shaft Drilling Slurry Inspection Report
- 040-060 Drilled Shaft Inspection Report
- 040-059 Continuous Pile Driving Record
- 040-058 Foundation Piling Driving Record
- 040-055 Field Lab Safety Equipment Inspection
- 040-052 Daily Report of CTB Mixtures
- 040-051 Field Report for CTB Strength Tests
- 040-046 Monthly Summary of Plant Establishment Activities
- 040-045 Daily Hotplant Worksheet
- 040-044 Contractor Past Performance Rating (Rev 03_19)
- 040-042 Weekly Trainee Report
- 040-038 Electronic Plant Calibration Worksheet
- 040-031 Nuclear Gauge Transfer and Packing Form
- 040-028 Safety Checklist Contractors Operation
- 040-027 Rock Compaction Inspection Report
- 040-024 Concrete Evaporation Rate and Cure Monitoring
- 040-022 Progress Lab-Field Laboratory Inspection Report
- 040-020A Construction Emulsion Trailer Inventory
- 040-020 Inventory of Standard Testing Equipment
- 040-019 Dowel Bar Placement Worksheet
- 040-018 Compaction Report for PBS Drilled Core Data
- 040-013 Field Material Sieve Sheet
- 040-011B Daily Paving Inspector
- 040-011A Daily Plant Inspector
- 040-008 Daily Costs of Force Account w Standby
- 040-005 Audit Report Form for Compaction Curve
- 040-002 Record of Authorization To Proceed With Extra Work
- 040-000 Vehicle Weight Limit
- Request for Payment for Materials On Hand 040-015
- Stockpile Payment (Electronic)
- Force Account Equipment Listing (Electronic)
- Daily Record of Scale Weights 040-009 (Electronic)
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.