Nevada Department of Transportation
Home MenuDocuments
- NDOT-Rural Transit 5304 Grant Application-Section 2_v13
- NDOT-Rural Transit 5304 Grant Application-Section 1_v16
- Section 5304 fact sheet
- FFY2023 Federal Award Identification Numbers
- FFY 2023 Certificates and Assurances
- Nevada DOT Multi-Year Operating Budget Form
- 2023 Operating Assistance Addendum
- 2023 New Applicant Addendum
- 2023 Grant Application
- 2023 Capital Assistance Addendum
- FFY2022 FAINs 07.28.2022
- FFY2021 FAINs 07.28.2022
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT New Applicant Addendum_FINAL
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT Multi-Year Capital Budget Form_FINAL
- Nevada DOT New Applicant Addendum_FINAL
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT Current Asset Inventory Form
- Nevada DOT Capital Assistance Addendum (fillable)_FINAL
- Nevada DOT Operating Assistance Addendum
- Nevada DOT New Applicant Addendum
- Nevada DOT Multi-Year Operating Budget Form
- Nevada DOT Multi-Year Capital Budget Form
- Nevada DOT Federal Grant Application Instructions
- Nevada DOT Federal Grant Application
- Nevada DOT Capital Assistance Addendum
- Nevada DOT Current Asset Inventory Form
- State Management Plan Published Dec 2020
- RTAP Travel & Training Request and Reimbursement Forms
- F:\TRANSIT\Transit Administration\Procedures\Procedure - RTAP Travel & Training Request and Reimbursement Policy & Forms
- F:\TRANSIT\Transit Administration\Procedures\Procedure - Disposition Guidance
- FFY2020+ RTAP FAINs 01.23.2020
- NEVADA DOT CHSTP APPENDIX Final Draft
- FFY2020 FAINs 05.19.2020 CARES Act
- NEVADA DOT 2018 CHSTP
- FTA C 8100.1C PROGRAM GUIDANCE FOR MPOs AND SPR PROGRAM GRANTS
- FTA C 6100.1E RTAP PROGRAM MANAGEMENT GUIDELINES
- FTA C 5300.1 STATE OF GOOD REPAIR GUIDANCE
- FTA C 5010.1E AWARD MANAGEMENT REQUIREMENTS
- FTA C 4710.1 ADA GUIDANCE
- FTA C 4704.1A EEO REQUIREMENTS AND GUIDANCE
- FTA C 4702.1B TITLE VI REQUIREMENTS AND GUIDANCE
- FTA C 4220.1F THIRD-PARTY CONTRACTING GUIDANCE
- 2 CFR Part 200
- 2011 CHSTP
- FFY 2018 5311 Distributions
- FFY17 5311 Distribution
- Public Participation Process
- 2008 CHSTP
- FFY2019 FAINs
- FTA C 5100.1 [5339]
- FTA C 9040.1G [5311]
- FTA C 9070.1G [5310]
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov