Nevada Department of Transportation
Home MenuDocuments
- 040-003 Nuclear Gauge - Sand Cone Check Test Form - Proctor
- 040-006 Field Sand Equivalent Worksheet
- 040-007 Nuclear Compaction Report for Soils and Aggregates - Proctor
- 040-010 Daily Report of Tests Made in Field
- 040-011 Daily Plant Report of Asphalt Mixtures 7-20-2018
- 040-014 Field LL-PI Worksheet
- 040-016 Report of Tests of Portland Cement Concrete Pavement
- 040-017 Nuclear Thin Layer Compaction Report for Plantmix Bituminous Pavements
- 040-017A Nuclear Thin lift Correction Factor Worksheet
- 040-017B Bulk Specific Gravity and Density of Compacted Bituminous Mixtures
- 040-021 Striping Paint Thickness
- 040-023A Absorption and Specific Gravity for Fine Aggs
- 040-023B Absorption and Specific Gravity for Coarse Aggregates
- 040-025 Transit Mix Concrete Delivery
- 040-026 Nuclear Gauge - Sand Cone Correlation - Proctor
- 040-030 Theoretical Maximum Specific Gravity of Bituminous Paving Mixtures (Field Method)
- 040-032 Emulsion Viscosity Worksheet (chip seal and cold-recycle)
- 040-035 Report of Field Tests of Coarse and Fine Aggregate for Concrete
- 040-041 Retroreflectivity Measurements
- 040-047 Pavement Marking Film Adhesion
- 040-048 Nuc Gauge Worksheet for Control Strip Density
- 040-050 Field Material Sieve Test-Bituminous ratio By Ignition Method
- 040-053 Report of C.F. (Including Weekly Checks) using the Ignition Furnace Method
- 040-063 Report of Pull-off Test for Polymer Concrete
- 040-069 Proctor Form - Electronic
- 040-069 Proctor Form
- 040-078 Concrete Field Summary Report
- 020-018 Transmittal for Test Samples and Certifications
- 020-017 Transmittal for Concrete Samples
- 020-016 Transmittal for Asphalt Samples
- 020-096 Certificate of Compliance Rev Feb 2019
- 020-095 Certificate of Materials Origin Rev Apr 2023
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov