Nevada Department of Transportation
Home MenuDocuments
- 623 Ramp Meter System - Test Procedures 2021
- 623 Ramp Meter System - Test Procedures 2021
- 623 Wrong Way Driver Warning System - Test Procedure 2021
- 623 WebRelay Controller - Test Procedure 2021
- 623 Unlicensed Microwave PTP - Test Procedure 2021
- 623 Unlicensed Microwave PMP - Test Procedure 2021
- 623 Traffic Actuated Controller, 170E - Test Procedures 2021
- 623 Solar Power Supply - Test Procedures 2021
- 623 Solar Photovoltaic Array - Test Procedures 2021
- 623 Road and Weather Information System - Test Procedure 2021
- 623 Radio Tower - Test Procedure 2021
- 623 Radar Detector System - Test Procedure 2021
- 623 Mountain Top Communication Building - Test Procedure 2021
- 623 Licensed Microwave PTP - Test Procedure 2021
- 623 Flashing Beacon Controller - Test Procedure 2021
- 623 Field Hardened Ethernet Switch - Test Procedure 2021
- 623 Equipment Cabinet - Test Procedures 2021
- 623 Dynamic Message Sign - Test Procedure 2021
- 623 Curve Warning System - Test Procedure 2021
- 623 Communication Cabinet - Test Procedures 2021
- 623 Communication Building- Test Procedure 2021
- 623 Cellular Telephone Modem- Test Procedure 2021
- 623 CCTV Camera (PTZ) - Test Procedure 2021
- 623 CCTV Camera (Fixed) - Test Procedure 2021
- 623 Wrong Way Driver Warning System - Test Procedure
- 623 WebRelay Controller - Test Procedure
- 623 Unlicensed Microwave PTP - Test Procedure
- 623 Unlicensed Microwave PMP - Test Procedure
- 623 Traffic Actuated Controller, 170E - Test Procedures
- 623 Solar Power Supply - Test Procedures
- 623 Solar Photovoltaic Array - Test Procedures
- 623 Road and Weather Information System - Test Procedure
- 623 Radio Tower - Test Procedure
- 623 Radar Detector System - Test Procedure
- 623 Mountain Top Communication Building - Test Procedure
- 623 Licensed Microwave PTP - Test Procedure
- 623 Flashing Beacon Controller - Test Procedure
- 623 Field Hardened Ethernet Switch - Test Procedure
- 623 Equipment Cabinet - Test Procedures
- 623 Dynamic Message Sign - Test Procedure
- 623 Curve Warning System - Test Procedure
- 623 Communication Cabinet - Test Procedures
- 623 Communication Building - Test Procedure
- 623 Cellular Telephone Modem - Test Procedure
- 623 CCTV Camera (PTZ) - Test Procedure
- 623 CCTV Camera (Fixed) - Test Procedure
- NDOT Traffic Signal Lighting ITS Design Guide_2019Edition_Final-PrintEdits
- FHES - 2018-10-01 to 2019-09-30
- NDOT Traffic Signal Lighting ITS Design Guide_2018Edition-FINAL
- SLI DesignGuide
- NDOT Letterhead Final Product Selection Directions v2
- Certification Report_Form
- PIF Report_Form
- 2017_0522-C03
- 2017_0522-C02
- 2017_0522-C01
- 2017_0301-C01
- 2017_0127-P01
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov