Contract Escalation Clauses

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

In an effort to share the risk of fluctuating materials prices with the contractor, the Department uses several escalation clauses. The Fuel Escalation Clause can be used for any contract greater than $250,000. The Fuel Factor Percentage for a contract is calculated based on the value of selected items in the Engineers Estimate to provide an average fuel usage for the contract items. The Asphalt Escalation Clause is used for any contract with more than 4,000 tons of plantmix. Currently the clause only applies to paving grade asphalts. The Emulsified Asphalt Escalation Clause is intended to minimize the cost effects of price uncertainty to the Contractor and the Department. Prices are the same as AWP Asphalt Prices.

Select a link below to see currently posted escalation prices.

Questions on the escalation clauses can be directed to the Construction Division at 775-888-7460.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer