U.S. 50 Dayton Operational Study

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Car on a long road near mountain

Virtual Public Meeting

On May 11, 2021, NDOT hosted a virtual public meeting to gather public feedback on concepts for future improvements to this stretch of highway. A live virtual presentation, including a question and answer session, was held at 5:30 p.m. May 11.

The meeting included a live presentation by the NDOT project manager followed by a question and answer session. The meeting lasted approximately an hour and a half.

U.S. 50 Operational Study 

Part 1
Part 2_Appendix A
Part 3_Appendix 1
Part 4_Appendix 2-4
Part 5_Appendix 5-7
Part 6_Appendix 8
Part 7_Appendix B
Part 8_Appendix C-E
Part 9_Appendix F
Part 10_Appendix G-M

Meeting Presentation Slides

U.S. 50 Proposed Highway Concepts 

ALL ALTERNATIVES PRESENTED ARE PRELIMINARY AND SUBJECT TO REVISION.

U.S. 50 Arterial Concept.mp4
U.S. 50 Parkway Concept.mp4
U.S. 50 Controlled Access Concept.mp4

Retail Road & U.S. 50 Intersection Concepts.pdf
Fortune Drive & U.S. 50 Intersection Concepts.pdf
Six Mile Canyon & U.S. 50 Intersection Concepts.pdf
Pinenut Drive & U.S. 50 Intersection Concepts.pdf

 

Watch the May 11 Public Information Meeting in full here.  

 

Background

In recent years, traffic has increased on sections of U.S. 50 in Dayton, with some areas growing from 12,500 vehicles daily in 2014 to nearly 18,000 in 2019. In light of this growth, NDOT is conducting an operational study of U.S. 50 from Pinecone to Neigh roads in east Dayton.

Project Fact Sheet

Operational Study Goals

The study will present three distinct concepts for enhanced highway safety, access, and operations to address future growth. 

The concepts range from controlling or limiting points of highway access for a smoother highway commute to additional highway access via multiple intersection control designs. Specific possible enhancements could include a divided highway, additional highway lanes or frontage roads, roundabouts, traffic signals, and other intersection designs. ALL ALTERNATIVES ARE PRELIMINARY AND SUBJECT TO REVISION

Potential improvements could be made in future years based on funding. 

Study Timeline

The following is a general schedule of the expected study timeline. 

  • May 11, 2021
    NDOT hosts a virtual public meeting in which the community, stakeholders, and others can share their opinions and ideas about the U.S. 50 Dayton area and potential vision and long-term improvements.
  • May 11, 2011 – June 1, 2021
    Public comment period is open for community feedback during and following the May 11 public meeting.
  • June 2021 - July 2021
    Concept Alternatives report is developed to suggest proposed long-term improvements and corridor vision.
  • Future
    Improvements could be made in future years based on funding availability.

Study Map 

The Nevada Department of Transportation's (NDOT) U.S. 50 Dayton Operational Study is located between Pinecone and Neigh roads.

Map of US 50 near Dayton

 

Public Meeting Archive 