Nevada Department of Transportation
Home MenuPrograms/Studies
Regional
- Apex to Mesquite and Moapa Valley Corridor Study
- Future I-11 Nevada
- I-15 Central Corridor
- I-15 Corridor System Master Plan
- I-15 Mobility Alliance
- I-15 South Corridor Improvement Sloan Road to Tropicana Avenue Environmental Assessment
- I-515 Alternatives Development Study
- I-515 Charleston Boulevard Interchange Environmental Assessment
- I-80, 2020 Corridor Study
- I-80 Corridor Systems Management Plan (2014)
- I-80 East Study
- I-80, 2009 Corridor Study
- Mt. Rose Highway Corridor Study
- Proposed Las Vegas Stadium Traffic Assessment
- Pyramid Highway/US 395 Connection Environmental Impact Statement (EIS)
- Southern Nevada High-Occupancy Vehicle Plan
- Southern Nevada Traffic Study
- State Route 160 and 159 Corridor Study
- State Route 361 Roadway Realignment Project
- US 50 Dayton Operational Study
- US 50 East Corridor Study 2.1 MB - pdf file
- US 50 Tahoe East Shore Corridor Management Plan
- US 395 Land Use Study
- U.S. 395 Southern Sierra Corridor Study
- US 395 Washoe County Corridor Study
- Western Nevada Study
Innovation and Initiatives
- Integrated Transportation Reliability Program
- Pioneer Program
- Complete Streets Policy - Building Roads For All Users
- Rest Area Rebuild Program - Rest Area Design Concepts
Traffic Safety Engineering
Statewide
Economy
- Connecting Nevada - Planning our Transportation Future
- Cost Allocation Study 2009
- Goods Movement Study
- Executive Summary
- Overview
Additional Plan Documents
Environmental
- Landscape and Aesthetic Corridor Plans
- Stormwater Management Program
- Transportation Emissions Reduction Program
Communications
Federal Lands Connectivity