I-80 Corridor Systems Management Plan

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

I80_truck_01The I-80 Corridor System Master Plan (I-80 CSMP) was initiated by the Nevada Department of Transportation (NDOT) in Spring 2012. The final study was completed in 2014.

The primary goal of the plan was to identify a broader scope of elements that can improve the mobility of the I-80 corridor and the livability of the communities it serves. The update for the I 580/I 80/ US 395 interchange portion of the study is available.

A wider range of topics related to the I-80 corridor over previous studies were discussed. Additionally, a wide range of stakeholders ranging from federal, state, regional, and city agencies as well as business professional and involved citizens from four states (California, Nevada, Utah and Wyoming) participated.

The objective was to provide a collaborative venue to share information, identify problems, and provide solutions that captured the perspectives and ideas for this project ultimately led to the creation of the I-80 Stakeholder Network.

Additional information about the I-80 CSMP, provided by the I-80 Stakeholder Network, is available on the Study Website. In addition, for historical context the 2009 I-80 Corridor Study is also available.

I-80 CSMP Appendixes

Related Planning Links

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer