I-80 Corridor Study

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

North McCarran to USA Parkway

I-80 WB Sparks resizeThe I-80 Corridor Study looked at the Reno-Sparks Freeway System from North McCarran Boulevard to USA Parkway. The reasons to study this corridor were many and ranged from population growth to increases in congestion and safety concerns.

Study Chapters

Executive Summary

Full Study (large file)

Full Study (no Appendixes)

Appendix A-Scoring Criteria

Appendix B-Environmental Review

Appendix C-Results

Appendix D-Alternative Conceptual Design

Appendix E-HOV Evaluation

Tor additional information please contact info@dot.nv.gov.