Interstate 15 Widening (Craig Road to Speedway Boulevard) Las Vegas

A photo of the Interstate 15 sign in NevadaNDOT is making a $33.8 million 4.8-mile-long widening of Interstate 15 between Craig Road (S.R. 573) and Speedway Boulevard (Mile Markers 48.43 to 53.62) in North Las Vegas. The project will expand the highway from four to six travel lanes, plus install new lighting, signage and landscaping featuring weathered steel art sculptures. Other work calls for drainage improvements as well as widening and seismic upgrades to four overpass structures at Range Road and the Union Pacific Railroad tracks. Las Vegas Paving is the general contractor. Construction will take place during daytime and nighttime hours, with at least two lanes of traffic remaining open at all times in each direction during peak use hours. The interstate currently sees 41,600 vehicles daily; however, that figure is expected to increase 71 percent by 2033. The project began construction in August 2016 and its anticipated completion is the third quarter of 2018.

Tropicana Avenue Overlay, Las Vegas

NDOT has finished its $7.7 million mill and overlay on Tropicana Avenue between Eastern Avenue and Boulder Highway. The department will kick off the second phase of Tropicana improvements in early 2018. That work will include new curbs, sidewalks, medians and ADA accessibility. 

Las Vegas Boulevard Upgrade, North Las Vegas

 

 

A $17.3 million upgrade to Las Vegas Boulevard between Carey Avenue to just north of Craig Road. The 4.6-mile-long project is underway and will include new concrete bus lanes, improve medians and place new curbs, gutters and sidewalks. The project is anticipated to be completed in January 2018.

Additional Travel Information and Resources

The logo for Nevada's 5-1-1 telephone servicePlease visit www.nvroads.com for full Nevada state road reports, including major road construction updates. Or, dial 511 before driving for Nevada road reports.

NDOT provides information on road conditions as a public service. This information is published manually and cannot be guaranteed as to accuracy or timeliness. This information depends on a number of items, including Internet availability, communications networks, and computer equipment which are beyond the control of the NDOT and difficult to predict.

Road construction conditions can change rapidly and the most immediate conditions can not always be reflected on this webpage. Weather and road conditions change rapidly, and drivers are in the best position to perceive such conditions and adjust their driving accordingly. Those relying on this information do so at their own risk, and neither the State of Nevada, the NDOT nor any of their employees or agents shall be liable for either the accuracy of this information nor any actions taken in reliance thereon.