Nevada Department of Transportation
Home MenuDocuments
- Agreements
- Contracts
- Records
- Bid Items
- Upcoming Construction Report
- ODVP
- Payroll & Comp Manual
- Vendor
- NDOT Regular Dealer-Distributor Affirmation Form 8.24
- EV Acceleration Challenge_alternative fuel page
- Secure Bid Acceptance Portal Manual
- Secure Bid Acceptance Portal Manual
- RFQ #300-18-015 Reno Early Action Project Desigh-Build
- K:\PQUAL\PQUAL\FORM\NDOTPrequalificationOver$250k_website_fillable
- Z:\070Agreements\RFP\RFP 697-16-016 NSRS ADDENDUM 3 FORM T
- Z:\070Agreements\RFP\RFP 697-16-016 NSRS ADDENDUM 3
- F:\070Agreements\RFP\C016 Traffic Operations\RFP 697-16-016 NSRS\NSRS\Attachments\RFP 697-16-016 NSRS 4-7-2017 Final
- F:\070Agreements\RFP\C016 Traffic Operations\RFP 697-16-016 NSRS\NSRS\Attachments\RFP 697-16-016 NSRS ATTACHMENTS
- F:\ODVP Shared Files\Office Documents\Web Documents\Self-Propelled Vehicle Application Fillable
- F:\ODVP Shared Files\Office Documents\Web Documents\Self-Propelled Vehicle Application Fillable
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 8-08 Green Weight Chart
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 8-08 Purple Weight Chart
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 8-08 SNV Weight Restrictions Map
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 8-08 ENV Weight Restrictions Map
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 8-08 WNV Weight Restrictions Map
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 8-08 Statewide Weight Restrictions Map-A
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 8-08 Statewide Weight Restrictions List
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 15-11.1 Spring Thaw map
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits LOI 15-11.1 Spring Thaw List
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OSOW Vehicle LOI 5-11
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OSOW Vehicle LOI 5-11
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OSOW Vehicle LOI 3-11 Width-Length Route Prohibitions Map
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OSOW Vehicle LOI 3-11 Width-Length Route Prohibitions List
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OSOW Vehicle LOI 3-11 Width-Length Route Prohibitions List
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OSOW Vehicle LOI 3-11
- F:\ODVP Shared Files\Office Documents\Web Documents\Self-Propelled Vehicle Application Fillable
- F:\ODVP Shared Files\Office Documents\Web Documents\Annual Permit Application Fillable
- F:\ODVP Shared Files\Office Documents\Web Documents\Low Clearance List LOI 15-9
- F:\ODVP Shared Files\Office Documents\Web Documents\NDOT OD Permits General Instructions 14-2
- F:\ODVP Shared Files\Office Documents\Web Documents\Self-Propelled Vehicle Application Fillable
- F:\ODVP Shared Files\Office Documents\Web Documents\Annual Permit Application Fillable
- F:\ODVP Shared Files\Office Documents\Web Documents\Self-Propelled Vehicle Application 3-17
- F:\ODVP Shared Files\Office Documents\Web Documents\Annual Permit Application 3-17
- F:\070Agreements\RFP\C016 Traffic Operations\RFP 697-16-016 NSRS\NSRS\Draft RFP 697-16-016
- nevada traffic laws for size 2 26 2016 FORMATTED booklet
- nevada traffic laws for size 2 26 2016 FORMATTED booklet
- District Quotes Oct to Dec 2015
- District Quotes July to Sept 2015
- District Quotes Oct to Dec 2010
- District Quotes Jul to Sep 2010
- District Quotes Oct to Dec 2014
- District Quotes Oct to Dec 2013
- District Quotes Oct to Dec 2012
- District Quotes Oct to Dec 2011
- District Quotes Oct to Dec 2010
- District Quotes July to September 2014
- District Quotes July to Sept 2013 (1)
- District Quotes Jul to Sep 2012
- District Quotes Jul to Sep 2011
- District Quotes Oct to Dec 2014
- District Quotes Oct to Dec 2013
- District Quotes Oct to Dec 2012
- District Quotes Oct to Dec 2011
- District Quotes Oct to Dec 2010
- District Quotes July to September 2014
- District Quotes July to Sept 2013 (1)
- District Quotes Jul to Sep 2012
- District Quotes Jul to Sep 2011
- District Quotes July to September 2014
- District Quotes July to Sept 2013 (1)
- District Quotes Jul to Sep 2012
- District Quotes Jul to Sep 2011
- District Quotes January to March 2014
- District Quotes Jan to Mar 2016
- District Quotes Jan to Mar 2015
- District Quotes Jan to Mar 2013
- District Quotes Jan to Mar 2012
- District Quotes Jan to Mar 2011
- District Quotes April to June 2014
- District Quotes Apr to Jun 2016
- District Quotes Apr to Jun 2015
- District Quotes Apr to Jun 2013_
- District Quotes Apr to Jun 2012
- District Quotes Apr to Jun 2011
- District Quotes Jul to Sep 2010
- Sample DBE Commitment Letter
- SAMPLE Service Agreement
- Upcoming_Construction_Projects
- MilepostandDistrictswithZones2012
- Certified Payroll and Compliance Manual - April 2016
- CC_RequestToSublet_ia
- CC_PayrollTracking
- CC_ContractorRegistration
- CC_Contractor_1391_Instructions
- CC_052-073CUFChecklist
- CC_052-067_ContractComplianceRvwCklist
- CC_052-063_SupplementalInfoConstWorkers
- CC_052-062FIContribut
- CC_052-061_10-12_RTUSP
- CC_052-060_SubcontractorPayments
- CC_052-009WeeklyWage_HR_PWC
- CC_052-005 _4-10_Non_Performance_payroll_sheet
- CC_052_009 _4-10_Payroll_Reverse_Side_Stmt_of_Comp
- Title VI Civil Rights Complaint Procedure and Form 9-12
- NDOT DBE Goal Methodology FY 2017-19
- CR_2012_Title_VI_Program_Plan
- Disparity Study Final Report Dec 2013
- 2012_June_DBE_Program_Plan
- ROW_OccupancyPermits
- Sign permit Ownership Transfer form
- ROW_SignPermitSupplementalApplication
- ROW_SignApplication
- 725W4thStWinnemucca
- 310GallettiWay(1)
- 1951EIdahoSt
- 1401EAultmanSt-Ely
- 123EWashingtonAve-LV
- NDOT OSOW Vehicle Letter of Instruction 5-11
- PCR_Western_Weight_Restrictions_Map
- PCR_Weight_Restrictions_map
- PCR_Weight_Restrictions_list
- PCR_Trucker_ODPInst6_07
- PCR_Southern_Weight_Restrictions_Map
- PCR_Purple_Loading
- PCR_Green_Loading
- PCR_Eastern_Weight_Restrictions_Map
- PCR_DOENV_990_REV3
- NRS_NAC Rules for Oversize_Overweight Vehicles 2012
- NDOT OSOW Vehicle LOI 3-11 Map
- NDOT OSOW Vehicle LOI 3-11 List
- NDOT OSOW Vehicle LOI 3-11
- NDOT ODVP LOI 14-1
- NDOT OD Permits LOI 15-11.1 Spring Thaw map
- NDOT OD Permits LOI 15-11.1 Spring Thaw List
- NDOT OD Permit 8-08
- NV_Permit_Routes
- NDOT Over Dimensional Vehicle Permits Letter of Instruction 3-10
- NDOT ODVP LOI 14-1
- FederalBridgeInstructionsTable
- Traction Control Devices Brochure Oct 2013
- Disparity Study Final Report Dec 2013
- IT Org Chart
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.