Nevada Department of Transportation
Home MenuDocuments
- 74271 Henderson Interchange CRA
- Henderson Interchange - Traffic Safety Analysis Report Final
- Henderson Handout
- Henderson Interchange PPT Jul 22 2021 (1)
- 06.14.21.HD Interchange Project Sheet
- 74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
- 74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
- COH_Henderson Feasibility Study_FINAL_021920 (1)
- COH_Henderson Feasibility Study_FINAL_021920 (1)
- COH_Henderson Feasibility Study_FINAL_021920 (1)
- COH_Henderson Feasibility Study_FINAL_021920 (1)
- 74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
- Attachment 2 74271 Option 2A NEPA E-W Guide Concept Plan 05-04-21
- Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
- Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
- Attachment 1 74271 Option 3_NEPA_N-S Exhibit 02-04-21
- Attachment 1 74271 Option 3_NEPA_E-W Exhibit 02-04-21
- Attachment 1 74271 Option 2A_NEPA_N-S Exhibit 04-28-21
- Attachment 1 74271 Option 2A_NEPA_E-W Exhibit 04-28-21
- Attachment 3 74271 Option 2A_Conceptual MOT Phasing_reduced
- Appendix 03 Alternatives Screening Report_reduced
- Attachment 2 74271 Option 3_NEPA_N-S_Guide_Sign_Concept_Plan_02-04-21
- Attachment 2 74271 Option 3_NEPA_E-W_Guide_Sign_Concept_Plan_02-04-21
- Attachment 2 74271 Option 2A_NEPA_N-S_Guide_Sign_Concept_Plan_05-04-21
- Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
- Attachment 1 74271 Option 3_NEPA_N-S Exhibit 02-04-21
- Attachment 1 74271 Option 3_NEPA_E-W Exhibit 02-04-21
- 74271_Henderson Interchange Alternatives Analysis Report_May 2021 (1)
- Appendix 17 Limited Geotechnical Assessment (1)
- Appendix 16 Drainage Facilities
- Appendix 15 FEMA Floodplain Documentation
- Appendix 14 TAC Meeting Minutes
- Appendix 13 UPRR Coordination
- Appendix 12 Summary of COH Hazmat Reports
- Appendix 11 Planning and Environmental Linkages
- Appendix 10 Public Involvement Activities
- Appendix 09 Cost Risk Assessment
- Appendix 08 BCA Report
- Appendix 07 Cost Estimate Worksheets
- Appendix 06 Conceptual Plans
- Appendix 05 Bridge Type Selection Study
- Appendix 04 Utilities
- Appendix 02 Synchro Output
- Appendix 01 Traffic Forecasting Memo
- HD Interchange Project Sheet
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov