Nevada Department of Transportation
Home MenuDocuments
- Active QPL 20240926
- 702.03.05 Pozzolans_ADA
- 497.02.04 Adhesives for Multilayer Overlays_ADA
- QPL acceptance criteria_625.02.06_Alternative Portable Barrier Rail
- QPL acceptance criteria_641.02.01_IMPACT ATTENUATORS_adopted 2018
- QPL acceptance criteria_646.02.04_SHEET MEMBRANE_adopted 2022
- QPL acceptance criteria_707.03.04_JOINT SEALER (FOR WEAKENED PLANE JOINTS IN PCCP)_adopted 2022
- QPL acceptance criteria_623.02.16_DUCT SEALING COMPOUND_public
- QPL acceptance criteria_497.02.05_AGGREGATES FOR MULTILAYER OVERLAYS_public
- Category 613.02.01_DETECTABLE_WARNINGS_(ADA_TILE)_modified_2020
- 646.02.02_CRACK SEALANTS
- 502.03.19_Fine Surface Finish (Bonded Grout)
- NDOT QPL acceptance criteria_401.03.02_Asphalt Release Agents_adopted 2020_ARC
- 502.0204b Concrete Paint 2019.09.10 ADA
- 408.02.05 All Weather Asphalt Cold Patch 2019.06.25 ADA
- 728.03.02 Epoxy Resin Adhesive for Bonding 2019.03.12 ADA
- 702.03.04 Curing Compound (Bridge Deck) 2019.03.12 ADA
- 702.03.01d Curing Compound (White Pigmented, Wax Base) 2019.03.12 ADA
- 702.03.01c Curing Compound (Liquid Membrane Forming for Curing Concrete) 2019.03.12 ADA
- 616.03.01 Fence Post Bag Mix Concrete 2019.03.12 ADA
- 609.03.02 Fast Setting Concrete Products (Non Structural) 2019.03.12 ADA
- 505.02.03 Epoxy Coatings (for Steel Reinforcing Bars) 2019.03.12 ADA
- 496.02.01 Overlay System (Polyester) 2019.03.12 ADA
- 625.02.04 Impact Attenuator (Temporary) 2018.06.12 ADA
- 618.02.01a Guardrail Terminal 2018.06.12 ADA
- 618.02.01 Guardrail Offset Blocks 2018.06.12 ADA
- 616.02.01 Plastic Fence Fabric 2018.06.12 ADA
- 502.03.22 Joint Sealer (Along Edges of Concrete Barrier Rail) 2016.09.13 ADA
- 214.02.01 Mailbox Support Systems (Type C) 2018.06.12 ADA
- 625.02.05 Impact Attenuator (Truck Mounted) 2018.06.12 ADA
- 642.02.02 MSE Wall-Concrete Panel 2014.12.09 ADA
- 646.02.05 Liquid Membrane 2017.09.12 ADA
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov