Nevada Department of Transportation
Home MenuDocuments
- Product Evaluation
- QPL
- Reports
- Research Newsletters
- 24-03-E1 RPS Evaluating Safety Impacts of Permissive Green Signal Phasing
- 24-02-E3 RPS An Assessment of Bat Use of NDOT-Managed Transportation Structures
- 24-01-E3 Proposal - UNR
- 24-01-E3 Proposal - UNLV
- 24-01-E3 Proposal - TTI
- 24-01-E3 Proposal - APTech
- Research Proposal Guidelines FFY25
- 24-01-E3 RPS Reclaimed Asphalt Pavement Aggregates
- 23-06-E4 Proposal - UNR
- 23-07-E2 Proposal - UNR
- 23-03-E2 Proposal - AtkinsRealis
- RPS 23-06-E4 Optimal Shoulder Configuration Study
- RPS 23-03-E2 Alternative Desert Tortoise Crossing
- Project Summary 564-22-803
- Project Summary 500-22-803
- Project Summary 399-20-803
- Project Summary 302-19-803
- Project Summary 296-22-803
- Project Summary 147-21-803
- Project Summary 142-21-803
- Problem Statement 23-01-E3 Develop Alternative Desert Tortoise Crossing
- Research Proposal Guidelines
- Standard Budget Itemization 2023.02.14
- Quarterly Progress Report Form 06.2022
- NDOT Billing Invoice Requirements 06.2022
- Project Summary 744-18-803
- Project Summary 743-18-803
- Project Summary 701-18-803TO1
- Project Summary 700-18-803
- Project Summary 593-18-803
- Project Summary 592-18-803
- Project Summary 494-18-803
- Project Summary 342-18-803TO02
- Project Summary 342-18-803TO01
- Project Summary 667-15-803
- Project Summary 450-15-803
- Project Summary 361-16-803
- Project Summary 365-16-803
- Project Summary 608-17-803
- Project Summary 643-15-803
- Project Summary 638-16-803
- Project Summary 609-13-803
- Project Summary 604-16-803
- Project Summary 366-16-803
- Project Summary 556-14-803
- Project summary 607-17-803
- Project summary 555-14-803
- Project summary 364-16-803
- Project summary 528-14-803
- Project summary 366-16-803
- Project summary 554-14-803
- Project Summary 557-14-803
- Project Summary 362-16-803
- CRPReportsPrep
- Revised NDOT Billing Requirements
- Research_Proposal_Budget_Template
- Research Manual
- Research Manual
- External_Problem_Statement_Format_2016
- Internal_Problem_Statement_2015
- NDOT_Full_Proposal_Guidelines_FFY_2016
- Quarterly_Progress_Report_Form_2016
- Research_Report_2016_515-13-803_LRFD_resistance_factor_calibration_axially_loaded_drilled_shafts_las_vegas_valley
- Research_Report_2015_017-12-803_Investigation
- Research Manual (1)
- Research_Report_2015_514-13-803_Investigatins
- RDT_13-001_Calibration
- RDT_10-001_Non-sacrificial_Anti-graffiti_Coating
- RDT_09-001_Safety_Analyst_Testing_Implementation
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov