Nevada Department of Transportation
Home MenuDocuments
- Grants
- Freight
- Freight Plan Story Maps Files
- Bike and Ped
- STTAC Documents
- Aviation Planning
- Nevada Aviation System
- NAHSP
- iPad application documents
- Rail
- State Rail Plan
- Rail Plan Chapters Final
- Transportation
- Research
- Roadway Systems
- Traffic Safety Engineering
- Traffic Reports
- Connecting Nevada
- Stormwater
- Automated and Connected Vehicles
- SPR
- NVBPAB September Agenda
- 23-21 Report Summary
- Formal Procedure and Guidance Document STIP 2024
- 23-19 Report Summary
- Amendment Report 23-19
- Amendment Report 23-15
- (1)2024 SPR AWP Draft Part I & II- Amendment 1.docx
- STIP Formal Procedure and Guidance Document PUBLIC COMMENT VERSION 5-29-24
- Amendment Report 23-17
- Amendment Report 23-17
- FY 25 - FY26 Approved Betterments
- CHAPTER TWO of the Research Manual (PE)
- DRAFT April 2024 Amendment Report (23-13)
- US50 CMP - Final Report DRAFT Feb26, 2024
- US50 CMP - TransBoard_3-11-24
- US50 CMP - PublicMtg2-27-24
- US50 CMP - Round 6 Boards
- 23-85 Amendment Summary Report 2-13-2024
- 23-83 Amendment Summary Report 2-13-2024
- 23-85 Amendment Summary Report 2-13-2024
- 23-83 Amendment Summary Report 2-13-2024
- Amendment 23-08 Non MPO
- Amendment 23-06 Non MPO
- Amendment 23-04 Non MPO
- Amendment 23-02 Non MPO
- 23-84 Amendment Summary Report
- QPL 20231215
- 23-09 Amendment Summary Report_092623
- US50 CMP - Public Comment Summary and Log 8-30-23
- 23-05 Amendment Summary Report 8-21-2023
- TPAC_Agenda_8_2_23
- Scenic Byways Map 2023 FINAL
- 2024 Transit Pop - Amendment Report
- U.S. 395 Southern Sierra Corridor Study (2007) Final
- 23-03 Amendment Summary Report 5-16-2023
- 23-03 Amendment Summary Report 5-11-2023
- TPAC_Agenda_4_5_23_FINAL (1)
- 23-01 Amendment Summary Report 1-27-2023
- 23-01 Amendment Summary Report 1-27-2023
- FFY23 - FFY26 Proposed STIP
- NDOT Betterments List - for Website
- FFY23 DRAFT Annual Work Program
- FFY23 - FFY26 DRAFT STIP
- FFY23 - FFY26 DRAFT 4-Year Work Program
- STIP Q4 2022 (21-33)
- Q3 2022 (21-25)
- STIP Amendment June 2022 Transit (21-35)
- Ely Downtown Infrastructure and Complete Streets
- Q2 2022 (21-20_21-23)
- performance management book 2021
- 2020 NDOT Strategic Plan
- 2020 NDOT Strategic Plan
- Non_MPO 21-25 Formal Amendment
- Formal Amendment Non_MPO 21-20
- Reno Flyer 1
- NVE_LasVegas_Promos_210927 1
- Formal Non-MPO_AMD 21-18
- 21-14 Formal Amendment (Non-MPO)
- FFY22_ Proposed_AWP_8_16_21
- 21-16_Formal_Amendment
- 21-12 Formal AmendmentReport_5_18_2021
- 21-13 NON MPO Admin Action Report
- 21-11 Admin Amendment Report
- 21-09 NON MPO Formal Amendment Report
- 2023 Description Index
- 21-10 NON MPO Administrative Amendment Report
- 2020 NDOT Quicks Facts & Figures
- 2020 NDOT Annual Report
- 21-05 Formal Amendment
- 21-08 Admin Mod Report_Public Site
- 2023 STATE PRESERVATION REPORT Final
- 2020 PERFORMANCE MANAGEMENT REPORT
- 21-06_Admin Modification Summary _Public Site
- 21-03 NONMPO_11_19_2020
- 21-03 Formal Amendment
- 21-04 Administrative Modification
- 21-03 Formal Amendment
- 21-02 Administrative Modification
- 20-39 Formal Amendment
- I-80 Corridor Study Executive Summary
- I-80 Corridor Study
- I-80 Corridor Final Report Jan 2020
- I-80 Appendix E
- I-80 Appendix D
- I-80 Appendix C
- I-80 Appendix B
- I-80 Appendix A
- I-80, 2020 Corridor Study Final Report
- Amendment Report_20-39 Formal Action_2019TIP_Combined_v5
- CROSSWALKS
- STIP CERTIFICATION.docx
- 2020_NV_TAP Guidance 1
- 2020_NV_TAP Guidance 2
- NV Moves ELT Update
- 2019_FactBook
- 2021 Performance Management Report
- performance management book 2019 print 2-10-20
- Flyer_NDOT-TransitPlan_v6
- 2019-12-30 TRIC Circulation Options Summary FINAL
- 2019-12-30 TMA Executive Summary
- 2019-05-30 Tech Memo #3 with Appendices
- 2019-02-12 Tech Memo #2
- 2018-11-01 Tech Memo 1
- Performance Management Report 2019 small final
- Biennial Performance Report 2018-2021
- RTCSNV - CMAQ Baseline Performance Plan - 10-03-2018
- 2018 Performance Management Report 2018
- FFY19 STIP Process REVISED
- 2018 FactBook Revised
- NDOT FFY18 OBLIGATION REPORT
- 2018 Fact Book by Performance Analysis
- State Highway Preservation Report 2021
- 2018 Performance Management Report
- 2017 Performance Management Report
- 2017 FactBook
- FFY18 STIP Process Approved
- C:\Users\h9003jrd\Desktop\Performance Analysis reports\PRES REPORT 2017 WEB
- performance management report 2017 Web
- PRES REPORT 2017 WEB
- FACT BOOK 2016 web
- 2003_Southern_Nevada_Transportation_Study
- 2002_US395WashoeStudy
- 2007_DouglasCarsonTravelDemandModel
- 2007_US_50_East_Corridor_Study
- 2002_Western_Nevada_Transportation_Study
- 2006_TrafficSafetyCharretteUS50_88
- US395_Washoe_Study_Appendix
- ADULTBIKE_PC_FINAL
- Nevada%20Tribal%20TIPs%20from%20BIA%207-31-2015
- FFY16%20STIP%20Certifications
- 2016%20STIP%20Process%208-27-2015
- 20%20year%20forecast%20for%20STIP%20091115%20
- Final Report Phase 1
- 2009_Cost_Allocation
- Uncontrolled Crosswalk Treatment Process 8-14-25
- REST AREA INITIATIVE Design and Budget Guidelines
- NEPA_EA_07_02_I15South
- Las Vegas Stadium Traffic Assessment
- Proj Status Rpt 9-30-16
- I80Appendix%20N
- I80Appendix%20M
- I80Appendix%20L
- I80Appendix%20K
- I80Appendix%20J
- I80Appendix%20I
- I80Appendix%20H
- I80Appendix%20G
- I80Appendix%20F
- I80Appendix%20E
- NevPlan_Appendices
- 2007_US_50_East_Corridor_Study
- NevPlan_StatewideTransPlan
- I80Appendix%20C
- I80Appendix%20B
- I80Appendix%20A
- Table%20of%20Contents
- Study%20Area
- Public%20and%20Stakeholder%20Involvement
- Introduction
- 2013_04_16_Transportation_Funding_Programs
- I80_2014_Appendix_04
- I80_2014_Appendix_02
- I80_2014_Appendix_01
- 2010Factbook
- Fact Book 2011 Final
- 2012 State of Nevada Transportation Facts and Figures
- 2013_factbook
- 2015 fact book web
- PRES BOOK WEB2
- 2014 fact book web2
- VMT FEE STUDY Bk
- Performance Management Report 2015 edited final
- Balducci Nevada DOT HCAS Compilation Report Jul 30
- 2000GoodsMovment
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov