Nevada Department of Transportation
Home MenuDocuments
- Carson City
- Churchill County
- Clark County
- Douglas County
- Elko County
- Esmeralda County
- Eureka County
- Humboldt County
- Lander County
- Lincoln County
- Lyon County
- Mineral County
- Nye County
- Pershing County
- Storey County
- Washoe County
- White Pine County
- 2024 AVMT Publication (2023 Data)
- 2023 AVMT Publication (2022 Data)
- Annual Vehicle Miles Traveled Report 2022
- 2022 DI FINAL COPY
- 2021 AVMT Publication (2020 Data)
- Functional Class Request Form
- 2020 Description Index
- 2020 Description Index -
- 2020 AVMT Publication (2019 Data)
- AVMT Report 2018
- C:\Users\H9805PGS\Desktop\2019 AVMT Publication - 2018 HPMS Data
- C:\Users\H9805PGS\Desktop\2019 AVMT Publication - 2018 HPMS Data
- C:\Users\H9805PGS\Desktop\2019 Description Index
- Adopted Guide to Road Relinquishments October 2018
- 2018 AVMT Publication - 2017 HPMS Data
- 2017 AVMT Publication - 2016 HPMS Data - FINAL
- FINAL Potential Pedestrian Safety Improvement Evaluation
- 2014 Washoe Freeway Update Report
- 2018 Description Index Master
- 2016 AVMT PUBLICATION BINDER
- 2014_AVMT_Publication
- 2013 Annual Vehicle Miles of Travel (AVMT)
- 2012 Annual Vehicle Miles of Travel (AVMT)
- 2011_AVMTa(1)
- 2010_AVMT
- 2009_AVMT
- 2008_AVMT
- 2007_AVMT
- 2006_AVMT
- 2005_AVMT
- 2004_AVMT
- 2009_FC_Procedures
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov