Nevada Department of Transportation
Home MenuDocuments
- Planning and Design
- SAM_Washoe
- SAM_Rural
- SAM_Clark
- 2017-12-14 SWMP Manual_Final_R
- Construction Site BMPs Manual (December 2017)
- FY17_Annual Report_Final_(All)
- Final SWOMP 8.11.17_V4
- Construction Site Stormwater Inspection Form 018001EP
- LTAPStormwaterFlyer
- U:\StormWater001\Website Docs\Resources and Documents\Contractors and Consultants\Notice to Reduce Frequency of Stormwater Inspections 018-005RF
- Stormwater Pollution Prevention Plan (SWPPP) Template for Construction Activities 018002SWPPP
- Construction Site Stormwater Inspection Form 018001WPCM
- Notice to Reduce Frequency of Stormwater Inspections 018-005RF
- FY 15 Annual Report sm2
- FY 14 Annual Report sm
- NDOT 8-Hour Stormwater Training Course (May 2016)(1)
- NDOT Washoe SAM
- NDOT Rural SAM
- NDOT Clark SAM
- NDOT 2010 MS4 Permit
- SWPPP Template Fillable Form Revised 8-8-16
- Stormwater Final Report
- Stormwater Brochure
- Nevada Contractors Field Guide for Construction Site BMPs (2013 Update)
- NDOT's Formal Response to EPA Audit Report Findings (6-29-12)
- NDOT_Maint_Facility_SW BMP Manual_20150803
- NDOT SWMP March 2013
- NDOT MS4 Audit Report_Final
- NDOT IDDE Program (Revised December 2014)
- IDDE_Field_Guide_March_2016
- FY16_Annual Report_Final_R
- FPPP_2016_Final
- CWSDforumClearCreek2015Presentation
- Construction Site Discharge Inspection Form_NDOT_EL_20160805
- 2006_Storm_Water_Quality_BMP_Manual
- 2017_PlanningAndDesignGuide
- 2006_Construction_Site_BMP_FieldManual
- MapStormwater Brochure
- Fact Sheet_MiningAggregate Facilities, V6
- Fact Sheet_Industrial_and Commercial_Facilities, V6
- Fact Sheet_Homeowners, V6
- Fact Sheet_Construction Sites, V6
- SWPPP Template Fillable Form Revised 8-8-16 DRAFT STAMPED
- NDOT Consent Decree as filed
- Construction Site Discharge Inspection Form_NDOT_EL_20160805 DRAFT STAMPED
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE