Nevada Department of Transportation
Home MenuDocuments
- Road Segment Data
- Output Data
- Navigating the map & using tools
- Intersection Data
- Attribute Tutorial
- West 4th Street SMP - Final Report_No Apx (2)
- E Bonanza Rd SMP Final Report without Appendices
- 2021-12-02 East Carey Avenue SMP_Final Report_no appendix
- 2021-01-29 Nevada CMF List_V1
- 2021-2025 NV SHSP
- HSIP Procedure Manual July 2020
- 2019-12-20 Sahara SMP Final Report_without appendix
- N McCarran SMP - Final Report_No Appendices
- 2019-12-20 Jones-Cheyenne Final Report_without appendix
- High Occupancy Vehicle (HOV) Plan - December 2018
- 2015 only HOV Plan
- Rancho SMP_Appendix
- Pedestrian Safety Improvement Evaluation Guideline Combined 4-2-2018
- Lamb SMP - PIM Handout
- Lamb SMP - Pub Mtg Presentation
- Lamb SMP - Pub Mtg Boards24x36
- C:\Users\aheckler\Desktop\Lamb SMP - Final Report - With Appendices
- McCarran SMP Handout
- McCarran SMP Presentation
- McCarran SMP Section Display Boards
- McCarran SMP Appendix
- McCarran SMP final
- 2017 Safety Management Plan 2nd Page Write-ups-Lamb
- 2017 Safety Management Plan 2nd Page Write-ups-McCarren
- 2017 Safety Management Plan 2nd Page Write-ups
- nv HSIP 2013
- nv HSIP 2014
- C:\Users\aheckler\Desktop\nv HSIP 2015
- C:\Users\aheckler\Desktop\nv HSIP 2016
- C:\Users\aheckler\Desktop\nv HSIP 2017
- C:\Users\aheckler\Desktop\Rancho SMP_Document
- NDOT Complete Street Policy Update 2017-Final
- short term projects_PublicDisplay_36x115 REV
- PIM 5 4 2016
- CrashSeverity_PublicDisplay_36x115 REV
- 2016-03-24 Eastern SMP PublicMeeting_Presentation
- 2016-03-24 Eastern SMP PublicMeeting_Packet
- 2016-03-24 Eastern SMP PublicMeeting_Boards
- 2016-09-28 Eastern Ave SMP Report_FINAL Reduced
- ProjectLimits INSERT
- Craig Road SMP Report July 2016 (Final)
- Craig Road SMP Appendix
- X:\Safety_Management_Plans\2nd Street & Arlington\2nd and Arlington SMP - FINAL
- X:\Safety_Management_Plans\2nd Street & Arlington\Presentations\SMP 2nd and Arlington - SWG Mtg 1
- X:\Safety_Management_Plans\2nd Street & Arlington\2nd and Arlington SMP - FINAL
- 2nd and Arlington SMP - FINAL
- NDOT Safety Engineering Crash Data Request Form
- Media Crash Data Request Form
- City; County; Engineering Firm Crash Data Request Form
- Citizen Crash Data Request Form
- Work Zone Safety and Mobility Implementation Guide 2015
- 2006_Nevada_Traffic_Crashes
- 2002_Nevada_Traffic_Crashes
- 2010_Nevada_Traffic_Crashes
- 2001_Nevada_Traffic_Crashes
- 2003_Nevada_Traffic_Crashes
- 1998_Nevada_Traffic_Crashes
- 2000_Nevada_Traffic_Crashes
- 1999_Nevada_Traffic_Crashes
- 2007-2009_Nevada_Traffic_Crash_Report
- SHSP_Report_V9
- SHSP Legislative Advisory Opinion Summary
- Southern Nevada HOV Plan - Appendices B through I
- Ramp Metering Performance Measurement Plan (2)
- PublicOutreachPrimer
- Introduction and Policies (2)
- SoNv HOV Plan Update Project Fact Sheet
- Implementation Plan
- Design Manual
- Southern Nevada HOV Plan Update
- 2006_TSS_Covers
- 2006_TSS_Contents
- 2006_TSS_Arrows
- 2006_TSS_Index
- 2006_TSS_Graphics
- 2006_TSS_Warning
- 2006_TSS_Regulatory
- 2006_TSS_Guide
- 2006_Sign_Supplement
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov