Nevada Department of Transportation
Home MenuDocuments
- RuralCoEngageRevitalizePlan
- Press Release
- Non Infrastructure Eligible Categories
- 2019_NDOT_TAP Guidance_Lem_clean
- Timeline
- PLANA PowerPoint Slides 2017
- Eligible Activities TAP
- TAP 2019 & 2020 Scoring Criteria
- PLANA
- 2016-2018 TAP Project List
- coloringpage4
- coloringpage3
- coloringpage2
- coloringpage1
- Rail Plan Map
- 2012_09_10_NVStateRailPlan_Appendix
- 2012_09_10_NVStateRailPlan
- KIDS_WALKBOOK_SPANISH
- SPANISH_NEW_FORMAT
- Bicycle Touring Map of Nevada
- KIDS_WALK_ENGLISH
- KIDS_BIKEBOOK_NEWFORMAT_SPAN
- KIDS_BIKEBOOK_NEWFORMAT
- ADULTBIKE_PC_FINAL
- MAP_SMALL_VERSION_SIDE2 - Copy
- MAP_SMALL_VERSION - Copy
- 2016-07-13 Pershing County Bike Plan
- 2016-06-27 Nye County Bike Plan
- 2016-07-13 DRAFT Mineral County Bike Plan
- 2016-03-01 Elko County Bike Plan-FINAL
- 2016-07-13 Lander County Bike Plan
- 2016-07-13 Lincoln County Bike Plan
- 2016-07-13 Lander County Bike Plan
- 2016-06-28 Lyon County Bike Plan
- 2016-06-21 Humboldt County Bike Plan(1)
- 2016-02-09 FINAL_White Pine County Bike Plan_with appendix
- 2016-02-10 FINAL_Esmeralda County Bike Plan_with appendix
- 2015-07-01 DRAFT Churchill County Bike Plan_Appendix
- 2014-10-28 Douglas County Bike Plan_FINAL
- 2013 0228 NDOT Bike Plan Final Plan
- Contact List _2014November_web
- Contact List .March 2016
- 1609agenda
- STTAC_Packet_2013_02_Feb
- STTAC_8_4_14_Packet
- STTAC 2012 1 14 Packet
- STTAC-Packet-2013-09-16
- Agenda_Packet 6-3-13
- STTAC-Packet-2013-09-16
- STTAC Packet 2015, June
- STTAC Agenda Packet Feb 2015
- STTACAgenda_12_2_13_Packet
- STTAC Packet 2015 September
- STTAC Agenda 12_15_packet
- Packet_4_13
- STTAC_Packet_2014_06_Jun.pdf
- STTAC_Packet_2013_05_Aug
- STTAC_Packet_2013_01_Jan
- STTAC_Packet_2014_06_Jun.pdf
- STTAC Packet 2015, April(1)
- Agenda_10_6_14_Packet
- 2014 October_STTAC_Special_rev
- STTAC_Packet_4_7_14
- STTAC_Packet_2_4_14
- Membership_rev
- Bylaws_09_rev2
- STTAC_10_3_16 Packet
- STTAC Agenda Packet Feb 2016
- Membership_rev
- Bylaws_09_rev2
- 2016 STTAC Packet Aug
- UPDATED - Trans Planning Metro NonMetro and Tribal Consult Process March2016
- awpIntro_2014Oct
- Lake Tahoe Basin Needs Assessment Final Report April 2012
- Final NV Coord Human Services Plan 2011
- FFY 2017 PG FTA 2ND FORM OPINION OF COUNSEL
- 5339 Apportionment
- 5311 Apporionment
- 5310 Apportionment
- 2017 GRANTAPPLICATION (for Grantees)
- 2016_Certs_and_Assurances_FINAL
- NDOT_State_Management_Plan_2015
- TAP_List_FINAL
- TAP_Historical_Proj_List
- 2016_NV_TAP%20Guidance
- 2016%20TAP_Scoring_Criteria_Non_Infrastructure%204_26_16%20Watermark%20appendix%20B
- 2016%20TAP_Scoring_Criteria_Infrastructure%204_26_16%20Watermark%20appendix%20A
- 2016%20TAP_Eligible%20Categories%204_26_16%20Watermark%20appendix%20F
- 2010_Census_State
- 2010_Census_NW_Nevada
- 2010_Census_District_3_Map
- 2010_Census_District_2_Map
- 2010_Census_District_1_Map
- 2010_Census_Clark_RTC
- TAP_Funding_Est
- 2013-2014 TAP Project List
- 2015_TAP_Projects(1)
- LandA_RevegFnlReport (1)
- LandA_RevegFnlReport
- LandA_MasterPlan-July3
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov