Nevada Department of Transportation
Home MenuDocuments
- library_periodicals_131014
- NDOT_Library_ Account
- New_Books_Fall_2014
- Research Manual
- Winter 2011
- Winter 2010
- Winter 2009
- Winter 2008
- Winter 2007
- Winter 2006
- Winter 2005
- Winter 2004
- Winter 2003
- Winter 2001
- Winter 2000
- Winter 1999
- Winter 1998
- Winter 1997
- WinterNewsletter 2017
- Winter 2013
- Fall2011
- Fall_2013_Newsletter
- Fall 2010
- Fall 2009
- Fall 2008
- Fall 2007
- Fall 2006
- Fall% 2005
- Fall 2004
- Fall 2003
- Fall% 2002
- Fall 2001
- Fall 2000
- Fall 1999
- Fall 1998
- Fall% 1997
- summer 2011
- Summer 2010
- Summer 2009
- Summer 2008
- Summer 2007(1)
- Summer 2006
- Summer 2004
- Summer 2003
- Summer 2002
- Summer 2001
- Summer 2000
- Summer 1999
- Summer 1998
- Summer 1997
- Spring_Summer 2013 Newsletter
- Spring_Summer 2012
- Spring1997
- Spring1999
- Spring1998
- Spring2000
- Spring2010
- Spring2009
- Spring2008
- Spring2007
- Spring2006
- Spring2005
- Spring2004
- Spring2003
- Spring2002
- Spring2001
- NewsletterSpring2011
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov