Nevada Department of Transportation
Home MenuDocuments
- NDOT_DBE_Plan_8.20.24 Signed
- NDOT DBE Plan 8.20.24
- Title VI Complaint Form
- NDOT_DBE_Plan_8.20.24
- FFY25_Title_VI_Plan_Complete signed
- guide-for-writing-a-social-disadvantage-narrative
- NDOT LAP 2024
- DBE Cover Letter Template Nevada
- Personal Net Worth Statement 4.9.2024
- UCA 4.09.2024
- DECLARATION OF ELIGIBILITY 4.9.2024
- DBE Performance Plan Considerations
- NUCP Interstate Certification Affid
- Title VI Complaint Form
- NDOT nondiscrimination notice
- DBE Plan 8.2023 signed
- DBE Plan 8.2023
- Title VI Complaint Form Spanish (TÍTULO VI FORMULARIO DE QUEJA DE DISCRIMINACIÓN)
- NOTICE FTA DBE Goal
- 2023-2025 FTATriennialDBEGoal info for posting
- 2023 LAP
- NDOT Limited English Proficiency Plan
- NDOT 2024 Title VI Implementation Plan Complete
- NDOT Goal Methodology FFYS 2023-2025 Final 7.26.22
- Nevada Department of Transportation Disparity Study 2021
- NDOT Disparity Study Presentation 5-24-22
- 2023-2025 Triennial DBE Goal Public Information Meeting
- 2022 ADA Field Guide
- FTA_Title_VI_for_NDOT_9.14.21
- NDOT 2023-25 Triennial DBE Goal Presentation Public Meeting Notice
- NDOT 2021-2023 FTATriennialDBEGoalMethodology with noted changes
- 2021-2023 FTATriennialDBEGoalMethodology 2.17.21
- 2021-2023 FTATriennialDBEGoalMethodo
- FFY 2021 Title VI Implementation Plan Complete
- NOTICE
- FTATriennialDBEGoalMethodo
- NDOT Goal Methodology FFYS 2020-2022
- NDOT FTA DBE Plan Oct 2019
- DBE Handbook 6-4-19_
- Orientation, 8-27-19
- NDOT DBE Orientation 6-4-19
- DBE Handbook 6-4-19_
- NDOT Mentor-Protege 7-24-19
- DBE GFE
- PNW Statement Tech Corrections
- PNW Statement Tech Corrections
- MAP21 2018
- NDOT 2018-19 Title VI IP with corrected assurances
- NDOT 2018 Transit Title VI Program-Corrected by Transit 11.26.18
- NDOT-nondiscrimination-notice-to-the-public
- DS Presentation
- 2017 NDOT DISPARITY STUDY_FINAL
- NDOT Disparity Study Presentation Flyer
- Title VI Complaint Form
- Title VI Complaint Form (Spanish)
- Title VI Procedures (Spanish)
- Title VI Notice (spanish)
- Title VI Notice to the Public
- Title VI Complaint Procedures
- Nevada DOT MAP21EthnicityGenderSummaryforDBEDirectory 2017
- NDOT2017DBEPlanRevisions3.2018
- TitleVIImplementationPlan3.2018
- Title VI Complaint Form 3.2018
- NO CHANGE AFFIDAVIT
- Nevada Department of Transportation NAICS Code Expansion Request Form
- NDOT 2017 DBE Plan Revisions Final 8.21.17
- Affidavit of Certification
- 2015 NDOT Transit Title VI
- Affidavit of Certification
- Spousal Renunciation
- NUCP Interstate Certification Affivadit
- DBE Weekly Trucking Report form-fillable
- DBE Yearly Trucking Firm Equipment List-fillable
- DBE PNW Statement 11-3-2014
- Protege Application
- MOU, Mentor-Protege.doc
- Mentor Application
- Mentor-Protege Program
- FTA Triennial DBE Goal Methodology 9.29.17
- FTA Triennial DBE Goal Public Meeting Notice 9.2017
- FTA Triennial DBE Goal Public Meeting Notice
- 9 Transition Plans
- 8 Disability Protections
- 7 Foundations of the ADA Section 504
- 6 Nondiscrimination Requirements on Construction Contracts
- 5 Compliance and Enforcement
- 4 Implementation Plans
- 3 Nondiscrimination Assurances
- 2 Background and Purpose
- 17 Evaluating a Commercially Useful Function (CUF)
- 16 Commercially Useful Function
- 15 Evaluating Good Faith Efforts
- 14 DBE Contract Goals
- 13 Prompt Payment and Return of Retainage
- 12 Project Contract Administration
- 11 Program Overview
- 10 Self-Evaluation Basics
- 1 Overview of FHWA’s Civil Rights Program Requirements for Local Public Agencies
- U:\web page information\NDOT 2017 DBE Plan Revisions Final 8.16.17
- FTA Transit NDOT 3 Year Goal Submittal 2017 Revised 8.17.2017
- 4 Implementation Plans
- 3 Nondiscrimination Assurances
- 2 Background and Purpose
- 17 Evaluating a Commercially Useful Function (CUF)
- 16 Commercially Useful Function
- 15 Evaluating Good Faith Efforts
- 14 DBE Contract Goals
- 13 Prompt Payment and Return of Retainage
- 12 Project Contract Administration
- 11 Program Overview
- 10 Self-Evaluation Basics
- 1 Overview of FHWA’s Civil Rights Program Requirements for Local Public Agencies
- 6 Nondiscrimination Requirements on Construction Contracts
- 5 Compliance and Enforcement
- 8 Disability Protections
- 7 Foundations of the ADA Section 504
- 9 Transition Plans
- U:\web page information\LPA & MPO Agencies
- U:\web page information\Chamber List
- LPA & MPO Agencies
- Chamber List
- FTA Transit NDOT 3 Year Goal Submittal 2017 Revised 8.17.2017
- C:\Users\jblack\Documents\Training\Office\onedrive-for-business
- C:\Users\h9003jrd\Desktop\DBE from Terry\DBE Trucking
- C:\Users\h9003jrd\Desktop\DBE from Terry\NDOT DBE Plan Final 2016
- C:\Users\h9003jrd\Desktop\DBE from Terry\NDOT_Title_VI_Complaint_Procedure_and_Form_REV9-12
- Title VI Implementation Plan Final Version 2016
- Title VI Implementation Plan Final Version 2016
- 2017 NDOT DISPARITY STUDY_FINAL
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.