- 040-089A Visual Audit Nuke Density Gauge - Soils
- 040-091 Audit Report In-Place Density
- TONNAGE ITEMS SPREADSHEET BY CUTOFF DATE INSTRUCTIONS
- TONNAGE ITEMS SPREADSHEET BY CUTOFF DATE
- 040-028 Safety Checklist Contractors Operation
- Prepave PCCP
- Prepave PBS
- Bridge Pre-Pour Agenda strs
- 040-056B Work Zone Traffic Control Checklist
- 040-012 Contractor Traffic Log
- Weekly Trainee Report (Electronic)
- Suspension Letter 041420
- Risk Reserve Expenditure (Electronic)
- Resumption Letter 041420
- Precon Agenda Template_2023 Update
- NDA - Highway Job Resident Engineer Checklist (V06)
- LDs for Liquid and Emulsified Asphalts (Electronic)
- LDs for Asphalt Cement (Electronic)
- LD Worksheet for Lottman (Electronic)
- LD Worksheet for Asphalt Cement (Electronic)
- Invoice Recap Tracking Sheet
- Force Account Recap (Electronic)
- FHWA Pre-Authorization (Electronic)
- Equip Watch Recap (Electronic)
- EDOC Crew Checklist for Field Closeout with AWP Materials (06-2022)
- EDOC Crew Checklist for Field Closeout (04-2022)
- District relief of maint
- District Acceptance
- Cost Analysis (Electronic)
- Conflict Resolution Form, electronic
- Calc Sheet 040-034
- Bridge Pre-Pour Agenda strs
- Bill of Lading Calc Sheet (Electronic)
- 040-090 Dispute Process Documentation Worksheet
- 040-089 Visual Audit Report Form
- 040-088 Daily Biological Field Report (Electronic)
- 040-087 Material Deposit Usage Report
- 040-086 Nuclear Personnel Inspection
- 040-085 Field Lab Inspection
- 040-084 Ride Adjustment Columnar Sheet Rev. 7-20
- 040-081 Calibration of Unit Weight Measure
- 040-079 Visual Audit Report Form
- 040-074 Equipment Repair Form Utilized by the I.A.Lab
- 040-072 Report Form for Two-Way or Three-Way Audits
- 040-071 Audit Report Form for Concrete Tests
- 040-070 Audit Report Form for Concrete Aggregates
- 040-068 Sand Density Calculation
- 040-067 Water Volume Calculations for Sand Cone Apparatus and Measuring Vessel (Hat)
- 040-064 Pavement Core Record
- 040-061 Drilled Shaft Drilling Slurry Inspection Report
- 040-060 Drilled Shaft Inspection Report
- 040-059 Continuous Pile Driving Record
- 040-058 Foundation Piling Driving Record
- 040-055 Field Lab Safety Equipment Inspection
- 040-052 Daily Report of CTB Mixtures
- 040-051 Field Report for CTB Strength Tests
- 040-046 Monthly Summary of Plant Establishment Activities
- 040-045 Daily Hotplant Worksheet
- 040-044 Contractor Past Performance Rating (Rev 03_19)
- 040-042 Weekly Trainee Report
- 040-038 Electronic Plant Calibration Worksheet
- 040-031 Nuclear Gauge Transfer and Packing Form
- 040-028 Safety Checklist Contractors Operation
- 040-027 Rock Compaction Inspection Report
- 040-024 Concrete Evaporation Rate and Cure Monitoring
- 040-022 Progress Lab-Field Laboratory Inspection Report
- 040-020A Construction Emulsion Trailer Inventory
- 040-020 Inventory of Standard Testing Equipment
- 040-019 Dowel Bar Placement Worksheet
- 040-018 Compaction Report for PBS Drilled Core Data
- 040-013 Field Material Sieve Sheet
- 040-011B Daily Paving Inspector
- 040-011A Daily Plant Inspector
- 040-008 Daily Costs of Force Account w Standby
- 040-005 Audit Report Form for Compaction Curve
- 040-002 Record of Authorization To Proceed With Extra Work
- 040-000 Vehicle Weight Limit
- Request for Payment for Materials On Hand 040-015
- Stockpile Payment (Electronic)
- Force Account Equipment Listing (Electronic)
- Daily Record of Scale Weights 040-009 (Electronic)
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov