Nevada Department of Transportation
Home MenuDocuments
- Planning and Design
- SAM_Washoe
- SAM_Rural
- SAM_Clark
- 2017-12-14 SWMP Manual_Final_R
- Construction Site BMPs Manual (December 2017)
- FY17_Annual Report_Final_(All)
- Final SWOMP 8.11.17_V4
- Construction Site Stormwater Inspection Form 018001EP
- LTAPStormwaterFlyer
- U:\StormWater001\Website Docs\Resources and Documents\Contractors and Consultants\Notice to Reduce Frequency of Stormwater Inspections 018-005RF
- Stormwater Pollution Prevention Plan (SWPPP) Template for Construction Activities 018002SWPPP
- Construction Site Stormwater Inspection Form 018001WPCM
- Notice to Reduce Frequency of Stormwater Inspections 018-005RF
- FY 15 Annual Report sm2
- FY 14 Annual Report sm
- NDOT 8-Hour Stormwater Training Course (May 2016)(1)
- NDOT Washoe SAM
- NDOT Rural SAM
- NDOT Clark SAM
- NDOT 2010 MS4 Permit
- SWPPP Template Fillable Form Revised 8-8-16
- Stormwater Final Report
- Stormwater Brochure
- Nevada Contractors Field Guide for Construction Site BMPs (2013 Update)
- NDOT's Formal Response to EPA Audit Report Findings (6-29-12)
- NDOT_Maint_Facility_SW BMP Manual_20150803
- NDOT SWMP March 2013
- NDOT MS4 Audit Report_Final
- NDOT IDDE Program (Revised December 2014)
- IDDE_Field_Guide_March_2016
- FY16_Annual Report_Final_R
- FPPP_2016_Final
- CWSDforumClearCreek2015Presentation
- Construction Site Discharge Inspection Form_NDOT_EL_20160805
- 2006_Storm_Water_Quality_BMP_Manual
- 2017_PlanningAndDesignGuide
- 2006_Construction_Site_BMP_FieldManual
- MapStormwater Brochure
- Fact Sheet_MiningAggregate Facilities, V6
- Fact Sheet_Industrial_and Commercial_Facilities, V6
- Fact Sheet_Homeowners, V6
- Fact Sheet_Construction Sites, V6
- SWPPP Template Fillable Form Revised 8-8-16 DRAFT STAMPED
- NDOT Consent Decree as filed
- Construction Site Discharge Inspection Form_NDOT_EL_20160805 DRAFT STAMPED
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.