Nevada Department of Transportation
Home MenuDocuments
- Planning and Design
- SAM_Washoe
- SAM_Rural
- SAM_Clark
- 2017-12-14 SWMP Manual_Final_R
- Construction Site BMPs Manual (December 2017)
- FY17_Annual Report_Final_(All)
- Final SWOMP 8.11.17_V4
- Construction Site Stormwater Inspection Form 018001EP
- LTAPStormwaterFlyer
- U:\StormWater001\Website Docs\Resources and Documents\Contractors and Consultants\Notice to Reduce Frequency of Stormwater Inspections 018-005RF
- Stormwater Pollution Prevention Plan (SWPPP) Template for Construction Activities 018002SWPPP
- Construction Site Stormwater Inspection Form 018001WPCM
- Notice to Reduce Frequency of Stormwater Inspections 018-005RF
- FY 15 Annual Report sm2
- FY 14 Annual Report sm
- NDOT 8-Hour Stormwater Training Course (May 2016)(1)
- NDOT Washoe SAM
- NDOT Rural SAM
- NDOT Clark SAM
- NDOT 2010 MS4 Permit
- SWPPP Template Fillable Form Revised 8-8-16
- Stormwater Final Report
- Stormwater Brochure
- Nevada Contractors Field Guide for Construction Site BMPs (2013 Update)
- NDOT's Formal Response to EPA Audit Report Findings (6-29-12)
- NDOT_Maint_Facility_SW BMP Manual_20150803
- NDOT SWMP March 2013
- NDOT MS4 Audit Report_Final
- NDOT IDDE Program (Revised December 2014)
- IDDE_Field_Guide_March_2016
- FY16_Annual Report_Final_R
- FPPP_2016_Final
- CWSDforumClearCreek2015Presentation
- Construction Site Discharge Inspection Form_NDOT_EL_20160805
- 2006_Storm_Water_Quality_BMP_Manual
- 2017_PlanningAndDesignGuide
- 2006_Construction_Site_BMP_FieldManual
- MapStormwater Brochure
- Fact Sheet_MiningAggregate Facilities, V6
- Fact Sheet_Industrial_and Commercial_Facilities, V6
- Fact Sheet_Homeowners, V6
- Fact Sheet_Construction Sites, V6
- SWPPP Template Fillable Form Revised 8-8-16 DRAFT STAMPED
- NDOT Consent Decree as filed
- Construction Site Discharge Inspection Form_NDOT_EL_20160805 DRAFT STAMPED
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov