Nevada Department of Transportation
Home MenuDocuments
- Grants
- Freight
- Freight Plan Story Maps Files
- Bike and Ped
- STTAC Documents
- Aviation Planning
- Nevada Aviation System
- NAHSP
- iPad application documents
- Rail
- State Rail Plan
- Rail Plan Chapters Final
- Transportation
- Research
- Roadway Systems
- Traffic Safety Engineering
- Traffic Reports
- Connecting Nevada
- Stormwater
- Automated and Connected Vehicles
- SPR
- NVBPAB September Agenda
- 23-21 Report Summary
- Formal Procedure and Guidance Document STIP 2024
- 23-19 Report Summary
- Amendment Report 23-19
- Amendment Report 23-15
- (1)2024 SPR AWP Draft Part I & II- Amendment 1.docx
- STIP Formal Procedure and Guidance Document PUBLIC COMMENT VERSION 5-29-24
- Amendment Report 23-17
- Amendment Report 23-17
- FY 25 - FY26 Approved Betterments
- CHAPTER TWO of the Research Manual (PE)
- DRAFT April 2024 Amendment Report (23-13)
- US50 CMP - Final Report DRAFT Feb26, 2024
- US50 CMP - TransBoard_3-11-24
- US50 CMP - PublicMtg2-27-24
- US50 CMP - Round 6 Boards
- 23-85 Amendment Summary Report 2-13-2024
- 23-83 Amendment Summary Report 2-13-2024
- 23-85 Amendment Summary Report 2-13-2024
- 23-83 Amendment Summary Report 2-13-2024
- Amendment 23-08 Non MPO
- Amendment 23-06 Non MPO
- Amendment 23-04 Non MPO
- Amendment 23-02 Non MPO
- 23-84 Amendment Summary Report
- QPL 20231215
- 23-09 Amendment Summary Report_092623
- US50 CMP - Public Comment Summary and Log 8-30-23
- 23-05 Amendment Summary Report 8-21-2023
- TPAC_Agenda_8_2_23
- Scenic Byways Map 2023 FINAL
- 2024 Transit Pop - Amendment Report
- U.S. 395 Southern Sierra Corridor Study (2007) Final
- 23-03 Amendment Summary Report 5-16-2023
- 23-03 Amendment Summary Report 5-11-2023
- TPAC_Agenda_4_5_23_FINAL (1)
- 23-01 Amendment Summary Report 1-27-2023
- 23-01 Amendment Summary Report 1-27-2023
- FFY23 - FFY26 Proposed STIP
- NDOT Betterments List - for Website
- FFY23 DRAFT Annual Work Program
- FFY23 - FFY26 DRAFT STIP
- FFY23 - FFY26 DRAFT 4-Year Work Program
- STIP Q4 2022 (21-33)
- Q3 2022 (21-25)
- STIP Amendment June 2022 Transit (21-35)
- Ely Downtown Infrastructure and Complete Streets
- Q2 2022 (21-20_21-23)
- performance management book 2021
- 2020 NDOT Strategic Plan
- 2020 NDOT Strategic Plan
- Non_MPO 21-25 Formal Amendment
- Formal Amendment Non_MPO 21-20
- Reno Flyer 1
- NVE_LasVegas_Promos_210927 1
- Formal Non-MPO_AMD 21-18
- 21-14 Formal Amendment (Non-MPO)
- FFY22_ Proposed_AWP_8_16_21
- 21-16_Formal_Amendment
- 21-12 Formal AmendmentReport_5_18_2021
- 21-13 NON MPO Admin Action Report
- 21-11 Admin Amendment Report
- 21-09 NON MPO Formal Amendment Report
- 2023 Description Index
- 21-10 NON MPO Administrative Amendment Report
- 2020 NDOT Quicks Facts & Figures
- 2020 NDOT Annual Report
- 21-05 Formal Amendment
- 21-08 Admin Mod Report_Public Site
- 2023 STATE PRESERVATION REPORT Final
- 2020 PERFORMANCE MANAGEMENT REPORT
- 21-06_Admin Modification Summary _Public Site
- 21-03 NONMPO_11_19_2020
- 21-03 Formal Amendment
- 21-04 Administrative Modification
- 21-03 Formal Amendment
- 21-02 Administrative Modification
- 20-39 Formal Amendment
- I-80 Corridor Study Executive Summary
- I-80 Corridor Study
- I-80 Corridor Final Report Jan 2020
- I-80 Appendix E
- I-80 Appendix D
- I-80 Appendix C
- I-80 Appendix B
- I-80 Appendix A
- I-80, 2020 Corridor Study Final Report
- Amendment Report_20-39 Formal Action_2019TIP_Combined_v5
- CROSSWALKS
- STIP CERTIFICATION.docx
- 2020_NV_TAP Guidance 1
- 2020_NV_TAP Guidance 2
- NV Moves ELT Update
- 2019_FactBook
- 2021 Performance Management Report
- performance management book 2019 print 2-10-20
- Flyer_NDOT-TransitPlan_v6
- 2019-12-30 TRIC Circulation Options Summary FINAL
- 2019-12-30 TMA Executive Summary
- 2019-05-30 Tech Memo #3 with Appendices
- 2019-02-12 Tech Memo #2
- 2018-11-01 Tech Memo 1
- Performance Management Report 2019 small final
- Biennial Performance Report 2018-2021
- RTCSNV - CMAQ Baseline Performance Plan - 10-03-2018
- 2018 Performance Management Report 2018
- FFY19 STIP Process REVISED
- 2018 FactBook Revised
- NDOT FFY18 OBLIGATION REPORT
- 2018 Fact Book by Performance Analysis
- State Highway Preservation Report 2021
- 2018 Performance Management Report
- 2017 Performance Management Report
- 2017 FactBook
- FFY18 STIP Process Approved
- C:\Users\h9003jrd\Desktop\Performance Analysis reports\PRES REPORT 2017 WEB
- performance management report 2017 Web
- PRES REPORT 2017 WEB
- FACT BOOK 2016 web
- 2003_Southern_Nevada_Transportation_Study
- 2002_US395WashoeStudy
- 2007_DouglasCarsonTravelDemandModel
- 2007_US_50_East_Corridor_Study
- 2002_Western_Nevada_Transportation_Study
- 2006_TrafficSafetyCharretteUS50_88
- US395_Washoe_Study_Appendix
- ADULTBIKE_PC_FINAL
- Nevada%20Tribal%20TIPs%20from%20BIA%207-31-2015
- FFY16%20STIP%20Certifications
- 2016%20STIP%20Process%208-27-2015
- 20%20year%20forecast%20for%20STIP%20091115%20
- Final Report Phase 1
- 2009_Cost_Allocation
- Uncontrolled Crosswalk Treatment Process 8-14-25
- REST AREA INITIATIVE Design and Budget Guidelines
- NEPA_EA_07_02_I15South
- Las Vegas Stadium Traffic Assessment
- Proj Status Rpt 9-30-16
- I80Appendix%20N
- I80Appendix%20M
- I80Appendix%20L
- I80Appendix%20K
- I80Appendix%20J
- I80Appendix%20I
- I80Appendix%20H
- I80Appendix%20G
- I80Appendix%20F
- I80Appendix%20E
- NevPlan_Appendices
- 2007_US_50_East_Corridor_Study
- NevPlan_StatewideTransPlan
- I80Appendix%20C
- I80Appendix%20B
- I80Appendix%20A
- Table%20of%20Contents
- Study%20Area
- Public%20and%20Stakeholder%20Involvement
- Introduction
- 2013_04_16_Transportation_Funding_Programs
- I80_2014_Appendix_04
- I80_2014_Appendix_02
- I80_2014_Appendix_01
- 2010Factbook
- Fact Book 2011 Final
- 2012 State of Nevada Transportation Facts and Figures
- 2013_factbook
- 2015 fact book web
- PRES BOOK WEB2
- 2014 fact book web2
- VMT FEE STUDY Bk
- Performance Management Report 2015 edited final
- Balducci Nevada DOT HCAS Compilation Report Jul 30
- 2000GoodsMovment
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov