Nevada Department of Transportation
Home MenuDocuments
- Road Segment Data
- Output Data
- Navigating the map & using tools
- Intersection Data
- Attribute Tutorial
- West 4th Street SMP - Final Report_No Apx (2)
- E Bonanza Rd SMP Final Report without Appendices
- 2021-12-02 East Carey Avenue SMP_Final Report_no appendix
- 2021-01-29 Nevada CMF List_V1
- 2021-2025 NV SHSP
- HSIP Procedure Manual July 2020
- 2019-12-20 Sahara SMP Final Report_without appendix
- N McCarran SMP - Final Report_No Appendices
- 2019-12-20 Jones-Cheyenne Final Report_without appendix
- High Occupancy Vehicle (HOV) Plan - December 2018
- 2015 only HOV Plan
- Rancho SMP_Appendix
- Pedestrian Safety Improvement Evaluation Guideline Combined 4-2-2018
- Lamb SMP - PIM Handout
- Lamb SMP - Pub Mtg Presentation
- Lamb SMP - Pub Mtg Boards24x36
- C:\Users\aheckler\Desktop\Lamb SMP - Final Report - With Appendices
- McCarran SMP Handout
- McCarran SMP Presentation
- McCarran SMP Section Display Boards
- McCarran SMP Appendix
- McCarran SMP final
- 2017 Safety Management Plan 2nd Page Write-ups-Lamb
- 2017 Safety Management Plan 2nd Page Write-ups-McCarren
- 2017 Safety Management Plan 2nd Page Write-ups
- nv HSIP 2013
- nv HSIP 2014
- C:\Users\aheckler\Desktop\nv HSIP 2015
- C:\Users\aheckler\Desktop\nv HSIP 2016
- C:\Users\aheckler\Desktop\nv HSIP 2017
- C:\Users\aheckler\Desktop\Rancho SMP_Document
- NDOT Complete Street Policy Update 2017-Final
- short term projects_PublicDisplay_36x115 REV
- PIM 5 4 2016
- CrashSeverity_PublicDisplay_36x115 REV
- 2016-03-24 Eastern SMP PublicMeeting_Presentation
- 2016-03-24 Eastern SMP PublicMeeting_Packet
- 2016-03-24 Eastern SMP PublicMeeting_Boards
- 2016-09-28 Eastern Ave SMP Report_FINAL Reduced
- ProjectLimits INSERT
- Craig Road SMP Report July 2016 (Final)
- Craig Road SMP Appendix
- X:\Safety_Management_Plans\2nd Street & Arlington\2nd and Arlington SMP - FINAL
- X:\Safety_Management_Plans\2nd Street & Arlington\Presentations\SMP 2nd and Arlington - SWG Mtg 1
- X:\Safety_Management_Plans\2nd Street & Arlington\2nd and Arlington SMP - FINAL
- 2nd and Arlington SMP - FINAL
- NDOT Safety Engineering Crash Data Request Form
- Media Crash Data Request Form
- City; County; Engineering Firm Crash Data Request Form
- Citizen Crash Data Request Form
- Work Zone Safety and Mobility Implementation Guide 2015
- 2006_Nevada_Traffic_Crashes
- 2002_Nevada_Traffic_Crashes
- 2010_Nevada_Traffic_Crashes
- 2001_Nevada_Traffic_Crashes
- 2003_Nevada_Traffic_Crashes
- 1998_Nevada_Traffic_Crashes
- 2000_Nevada_Traffic_Crashes
- 1999_Nevada_Traffic_Crashes
- 2007-2009_Nevada_Traffic_Crash_Report
- SHSP_Report_V9
- SHSP Legislative Advisory Opinion Summary
- Southern Nevada HOV Plan - Appendices B through I
- Ramp Metering Performance Measurement Plan (2)
- PublicOutreachPrimer
- Introduction and Policies (2)
- SoNv HOV Plan Update Project Fact Sheet
- Implementation Plan
- Design Manual
- Southern Nevada HOV Plan Update
- 2006_TSS_Covers
- 2006_TSS_Contents
- 2006_TSS_Arrows
- 2006_TSS_Index
- 2006_TSS_Graphics
- 2006_TSS_Warning
- 2006_TSS_Regulatory
- 2006_TSS_Guide
- 2006_Sign_Supplement
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov