Nevada Department of Transportation
Home MenuDocuments
- Reports
- Final Environmental Impact Statement
- I-515 ADS
- Naturally Occurring Asbestos Information
- NOS Phase Reports
- Carson City Freeway
- USA Parkway Reports
- FFY23 DRAFT Annual Work Program
- FFY23 - FFY26 DRAFT STIP
- STIP Q3 2022 (21-25)
- 20 year forecast for STIP 2017 FY 2016 actuals v2
- RFQ 432-16-110 - Garnet Design-Build Project - Conceptual Plans
- Powerpoint Garnet Public Info Mtg 100616
- US95NW_project_map
- US95NW_Project_Management_Plan
- US95NW_Financial_Plan
- US 95-CC 215 Interchange (Phase 3) Map
- US 95 NW Phase 2A Roadway Improvements Map
- US 95 NW Phase 2 Landscape and Aesthetics Rendering
- US 95 NW Environmental ReEvaluation
- US 95 NW Corridor Improvements Overview Map
- Phasing Displays 3-10-16
- USAPkwy FactSheet6 02142015
- USAHandout_final(jm)8-8-16
- USA Pkwy PIM ppt 8-3-16 FINAL
- US95_Newsletter_May2015
- US 95 Nov 2015 Meeting Packet_Print (1)
- Phasing Displays 3-10-16(1)
- Phasing Displays 3-10-16
- NDOTnewsad_2015_4.9x6.75_rev
- I-15 EA102208 -2-Appendices
- I-15 EA102208 -1-Report
- Final Starr Handouts
- STARR FAQ V3
- Fact Sheet-Spring 2016
- TahoeBasin2015
- tahoe basin const map 2017
- Carson City Freeway
- SR28-July-26-PIM-Packet_v2
- SR-28-Flyer-Public-Hearing-042616
- SR 28 Fact Sheet FINAL(1)
- SR 28 Fact Sheet FINAL
- sr 28 cmp for web-131004
- Project News for the Community Volume 1 Issue 2
- Project News for the Community Volume 1 Issue 1
- EA North Demonstration Project(1)
- Reno Spaghetti Bowl Charrette Report_Final red
- Charrette Report Appendix_Final red
- Kietzke SMP Priority 2-3
- Kietzke Safety Management Plan Presentation
- Kietzke Safety Management Plan PDF
- Kietzke Lane Safety Management Plan Full Report Appendix
- Kietzke Lane Safety Management Plan Final Report
- Kietzke Lane Public Meeting Presention Feb 21, 2013
- Kietzke Lane Public Meeting No. 2 Handout
- Kietzke Lane Priority 1 Recommendations
- Kietzke Lane Pedestrian Bike Crash Data
- Kietzke Lane Crash Type Graph
- Kietzke Lane Crash Severity Graph
- CLV 515-Charleston Feasiblity Study Rev 4 signed
- 515 Factsheet Option 3
- 515 Charleston (final)Handouts Sep 22
- BCBypassRod
- RR_Pass_Intg
- 3580Rendering
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov