Nevada Department of Transportation
Home MenuDocuments
- NDOT-Rural Transit 5304 Grant Application-Section 2_v13
- NDOT-Rural Transit 5304 Grant Application-Section 1_v16
- Section 5304 fact sheet
- FFY2023 Federal Award Identification Numbers
- FFY 2023 Certificates and Assurances
- Nevada DOT Multi-Year Operating Budget Form
- 2023 Operating Assistance Addendum
- 2023 New Applicant Addendum
- 2023 Grant Application
- 2023 Capital Assistance Addendum
- FFY2022 FAINs 07.28.2022
- FFY2021 FAINs 07.28.2022
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT New Applicant Addendum_FINAL
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT Multi-Year Capital Budget Form_FINAL
- Nevada DOT New Applicant Addendum_FINAL
- Nevada DOT Federal Grant Application (fillable) with overview_FINAL
- Nevada DOT Current Asset Inventory Form
- Nevada DOT Capital Assistance Addendum (fillable)_FINAL
- Nevada DOT Operating Assistance Addendum
- Nevada DOT New Applicant Addendum
- Nevada DOT Multi-Year Operating Budget Form
- Nevada DOT Multi-Year Capital Budget Form
- Nevada DOT Federal Grant Application Instructions
- Nevada DOT Federal Grant Application
- Nevada DOT Capital Assistance Addendum
- Nevada DOT Current Asset Inventory Form
- State Management Plan Published Dec 2020
- RTAP Travel & Training Request and Reimbursement Forms
- F:\TRANSIT\Transit Administration\Procedures\Procedure - RTAP Travel & Training Request and Reimbursement Policy & Forms
- F:\TRANSIT\Transit Administration\Procedures\Procedure - Disposition Guidance
- FFY2020+ RTAP FAINs 01.23.2020
- NEVADA DOT CHSTP APPENDIX Final Draft
- FFY2020 FAINs 05.19.2020 CARES Act
- NEVADA DOT 2018 CHSTP
- FTA C 8100.1C PROGRAM GUIDANCE FOR MPOs AND SPR PROGRAM GRANTS
- FTA C 6100.1E RTAP PROGRAM MANAGEMENT GUIDELINES
- FTA C 5300.1 STATE OF GOOD REPAIR GUIDANCE
- FTA C 5010.1E AWARD MANAGEMENT REQUIREMENTS
- FTA C 4710.1 ADA GUIDANCE
- FTA C 4704.1A EEO REQUIREMENTS AND GUIDANCE
- FTA C 4702.1B TITLE VI REQUIREMENTS AND GUIDANCE
- FTA C 4220.1F THIRD-PARTY CONTRACTING GUIDANCE
- 2 CFR Part 200
- 2011 CHSTP
- FFY 2018 5311 Distributions
- FFY17 5311 Distribution
- Public Participation Process
- 2008 CHSTP
- FFY2019 FAINs
- FTA C 5100.1 [5339]
- FTA C 9040.1G [5311]
- FTA C 9070.1G [5310]
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov