Nevada Department of Transportation
Home MenuDocuments
- Notice for Public Meeting - I-11 Feasibility Study Kyle Canyon to Mercury Highway
- 2023 1031 NVACTS Agenda
- Smith (1)
- Six Mile
- Fortune (1)
- N Pinenut
- Arterial Concept 2
- Parkway Concept 2
- Controlled Access Concept
- PIM Meeting #1 - Presentation_v5
- ProjectOverview_Spanish
- I515_Traffic_control_Spanish
- I-515 Viaduct Rehab_VPIM_Presentation_Spanish
- Construction_Phases_Spanish
- I515_VPIM_FactSheet_Spanish (1)
- I515_room_instructions_Spanish (1)
- I515_Comment form_SPANISH (1)
- 2020 1202 NECTS Agenda_Public
- Spaghetti Bowl Xpress Public Meeting Notice Dec 2020
- November 9, 2020 Agenda
- October 12, 2020 Agenda
- September 14, 2020 Agenda
- 2020 0902 NECTS Agenda_Public
- NDOT I-11 Social Post 7-31-20_BOOST
- NDOT_DowntownAccessProject_Notice_8.5x11_English
- August 10, 2020 Agenda
- NDOT I-11_4.9x10in_print ad 7.29.2020
- DBENOTICE2020
- July 13, 2020 Agenda
- 03June 8, 2020 Agenda - Amended
- June 8, 2020 Agenda - Amended
- June 8, 2020 Agenda
- (jm)2020 0527 NECTS Agenda PUBLIC_Update2
- 2020 0527 NECTS Agenda PUBLIC
- 2020 0527 NECTS Agenda PUBLIC
- May 11, 2020 BOD Meeting Agenda
- STIP Procedure Change Public Comment Period Spring 2020
- final(jm)REVISED Indian Springs Tower Notice
- BOD 04_2020 Agenda
- Declaration of Emergency Directive 006 re OML.3-21-20
- REVISEDMt Brock Tower Notice
- BOD 03_2020 Agenda
- 2020 0303 NECTS Agenda
- 2020 0303 NECTS Agenda
- 2018 MS4 Permit SWMP Plan_Public Meeting Presentation_02-18-20
- I-15_Tropicana FONSI Notice of Availibility
- February 13, 2020 Agenda
- 2018 MS4 Permit SWMP Plan_Draft_Public Review_All
- SWMPP_notic-e-wDOC-2-18-20
- newsadsFinal_SWmgt.pln2-22-2020_PIM_JM
- BOD 01_2020 Agenda
- December 17, 2019 Agenda
- HD PIM Notice
- November 18, 2019 Agenda
- Final I-15 Trop. 11-19-19PIM_notice-summaryletter
- 2019-10-17 NECTS Agenda-Public
- October 14, 2019 Agenda
- CHSTP2019(mb)final1
- Starr_Evite_FINAL
- Pyramid Lake Packet 08 14 19_FINAL
- August 19, 2019 Board Agenda
- Ely handout8-7-19(jm)
- NDOT_SR447invite_digital
- Final_Ely PIM Notice 80719
- commentsheet
- SR317_pimHandout(jm)
- Grand_Finale_Evite
- DRAFT_NDOT Goal Methodology FFYS 2020-2022 (002)
- FINAL-(jm editsFHWA Triennial DBE Goal Public Meeting Notice 2020-2022
- Caliente PIM7-16-2019_final notice5-16
- June 17, 2019 Board Agenda
- June 17, 2019 CWG Agenda
- Jones-Cheyenne_SMP_MeetingPacket_FINAL__
- Sahara Ave_SMP_MeetingPacket_FINAL3
- Sahara_Flier_NDOT-CommunityConv_FINAL2_sml
- Jones-Cheyenne_Flier_NDOT-CommunityConv_FINAL_sml
- I-515 Charleston Public Hearing Presentation May 23 2019
- 515 Charleston Handouts for Web
- Charleston Public Hearing Notice Final
- May 13, 2019 Agenda
- PPTI-15 tropicana public meeting_2019-05-02
- I15 Tropicana Public Meeting 2 Meeting Packet FINAL
- Stormwater Monitoring Plan Presentation
- Final_Fact_sheet
- 2019-04-30 NECTS Agenda_Public
- SWcomment_sheet4-24-19
- I15 Tropicana Fact Sheet April 2019
- FINAL McCarran notice_4-17-19
- I-15Tropicaca_eblast_final(jm)4-4
- C:\Users\kchmura\Documents\Stormwater Monitoring Plan Through FY2024 FINAL
- C:\Users\kchmura\Documents\Stormwater Monitoring Plan Through FY2024 FINAL
- v2SWMPfinal_pimnotice4-24-19(wplan)
- SWMPfinal_pimnotice4-24-19(wplan)
- Stormwater Monitoring Plan to NDEP FINAL_(Pre-Public Review)
- FINALT01Stormwater PIMnotice4-24-19_NOTICE
- April 8, 2019 Agenda
- SWMP_pimnotice4-24-19(w-plan)
- Henderson Interchange Handouts Mar 27
- HD PIM Notice FINAL
- Nellis Materials combined
- March 11, 2019 CWG Agenda
- March 11, 2019 Agenda
- Welcome Packet_REV2
- Final2-8(ap)Nellis Blvd Transportation -edits FINAL Feb 4
- us 95c3Newspaper4
- Feb. 11, 2019 Agenda
- Jan 2019 Agenda (003)
- Jan 2019 Agenda (003)
- RP2019-01-22 NECTS Agenda_public
- 2019-01-22 NECTS Agenda_public
- NAC484DFINAL(jm)1-10post
- REVISED1-9(jm)DRAFT_NOTICE OF INTENT TO ACT UPON A REGULATION_484D
- NAC484D_finalnotice(jm)
- I-15 CC215 Welcome Packet
- December 3, 2018 Agenda
- NATAC-2018-AgendaPackage
- Dec 12 Notice final
- NDOT I15 CC215 Interchange_Public Meeting Notice_v2(JM)
- November 14, 2018 Agenda
- Intent to Act_v3(jm)Final10-29
- Dear Reader NDOT SilverSpring EA Comment
- NACworkshop10-25-18_jmfinal
- ACTSWM Agenda 10-08-18
- ACTSWM Agenda 10-08-18
- October 8, 2018 Agenda
- RSIC newsletter v2
- NOTICE OF INTENT TO ACT UPON A REGULATION
- 4X6_SBX
- NDOT Disparity Study Presentation Flyer
- September 10, 2018 CWG Agenda
- TBSeptember 10, 2018 Agenda
- FINAL_tropicanaIIPublic Notice_2
- Public Meeting Handout 515 215 Restripe 0818
- 2018-08-27 NECTS Agenda_Public
- Winn_Public Mtg Handout_low res_stantec 20180815
- TransBoard8-13-18
- August 13, 2018 Agenda
- I-515-215re-stripingFinal(v01jm)notice PIM8-22-18
- STIP notice(v1)
- Winnemucca_pim_Final-notice (lh) (003)
- update8-31(bg)Meeting Flyer
- I-11 NNAA - Pub Mtg 2 Handout
- Ely (revised 7-12)Handouts July 2018 Lower Res
- Ely Handouts July 2018 lower res
- July 9, 2018 Agenda
- July 9, 2018 Agenda
- July 9, 2018 Agenda
- July 9, 2018 Agenda
- July 9, 2018 Agenda
- July 9, 2018 Agenda
- July 9, 2018 Agenda
- July 9, 2018 Agenda
- FEIS Transp Notice - Final vers 061418
- Ely PIM Notice(jm)5-7
- I-11 NNAA PIM Meeting Flyer
- NDOT Seeks Rural Transit Public Input_REVISED
- CARSON CITY
- NDOT Seeks Rural Transit Public Input
- Ely PIM Notice(jm)5-7
- June112018Agenda
- June 11, 2018 CWG Agenda
- May 14, 2018 Agenda
- LH_updated4-23-18NAC Changes - AG Format
- Tonopah PIM4-18-2018handout
- (kw4-4)NAC Changes - AG Format 10-18-17
- (kw4-1)NAC Public Meeting Notice
- April 9, 2018 Agenda
- 4-3Final(JM) Tonopah public notice(VKim)1-19 (002)
- Final(JM) Tonopah public notice(VKim)1-19 (002)
- Final(JM) Tonopah public notice(VKim)1-19 (002)
- I-11 NNAA - Pub Mtg 1 Handout3-16-2018
- update(trifold)d2-28-18(ah)I-11 NNAA_Public Outreach 2018_v10
- I-11 NNAA - Public Meeting Flyer
- final2-20NDOT Ph 2B-5 Meeting Packet
- NDOT 2B-5 Meeting Packet
- 2018-02-20 NECTS Agenda_Public
- Las Vegas Review Newspaper Ad_Feb 2018
- NDOT_EasternAve_PublicMeetingPacket_FINAL-rev
- Las Vegas Review Newspaper Ad_Feb 2018
- FINAL 15 Tropicana Meeting Packet Jan 30 2018 (1)
- NDOTEasternAve_NewsAd_012218_final
- Trop Transportation Notice
- Flyer
- Jan. 8, 2018 Transportation Board Agenda
- NAC410(rb)12-19-17Binder1
- NAC410.400Binder2
- NAC410.400Binder1
- Garnet PIM Handouts V2
- Lamb SMP - PIM Handout
- Lamb rev. 11-27-17 Newspaper_Column_BW
- Garnet PIM Notice(jm11-14)
- Newspaper_Column_BW
- NATAC-AgendaPack2017
- LV Turn Lanes (73849) Section 4(f) de minimis Public Notice
- McCarran SMPfinalhandout(jm)11-13-17
- McCarran SMPfinalhandout(jm)11-13-17
- STARR_ GB11-30-17
- November 13, 2017 Agenda
- McCarran Safety Public Meeting Ad layout_FINAL
- October92017Agenda
- 2017-09-26 NECTS Agenda_Public
- Sept. 2017 PM Handouts
- CWG agenda 9-11
- Sept. 11, 2017 Agenda
- TPAC 9-7wkshp
- FINALRGJ ad 4.9x6.75
- SR439 flier
- SR439 flier
- April102017Agenda
- Aug. 14, 2017 Agenda
- CB_Invite
- 395 Flyer Invite
- July 6, 2017 Agenda
- ShowDocument
- CWG_agenda6-12-17
- cwg6-12-17notice
- Ely Handouts
- US50 LT safety Improv_PIM handout
- STTAC 6-2017
- Pahrump_Roundabout_Invite
- Ely PIM Notice_final
- US 50 LT_PIM5-31-17final(jm)
- US 50 LT_PIM5-31-17final(jm)
- May 8, 2017 Agenda
- showdocument
- SB Public Meeting docs
- Kietzke Ln.handout4-5-17(jm)
- April 10 2017 Agenda
- SR-28_PublicMeetingDraft_3_30_17-1
- SR28-March-30-2017-PIM-Packet-5
- Silver Springs EA Transportation Notice
- Artboard 1
- Reno_Ad_final4.9x6.75 (1)
- Reno_Ad_final4.9x6.75 (1)
- Kietzke TN final(v3-jm)
- 11266-CH2M-17-SR28-Mar-30-public-mtg-SNMG-ads-hp2
- NDOT_Craig Road AD English
- NDOT_Boulder Highway AD English
- NDOT_Craig Road AD English
- I15FrontageRdEA_11x17_IntenttoStudy
- I15FrontageRdEA_11x17_IntenttoStudy
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.