Nevada Department of Transportation
Home MenuDocuments
- Henderson Interchange
- Job#4577-TahoeBasinMap2023FullPage-v6
- tahoe basin const map 2022 8.5x11
- Henderson Interchange - Crash Analysis Report Final
- tahoe basin const map 2022 8.5x11
- NDOT Grant/Earmark Support Checklist
- NDOT Sahara Safety Project FAQ Spanish FINAL
- NDOT Sahara Safety Project FAQ FINAL
- NDOT Sahara Safety Project Fact Sheet Spanish FINAL
- NDOT Sahara Safety Project Fact Sheet FINAL
- MtRoseCorridorPlan-Volume2_Apr2022-small
- MtRoseCorridorPlan-Volume1_Apr2022-small (3)
- US50 CMP - Round 2 Boards_24x36
- April 2022 Upcoming Construction Projects
- NDOT Sahara Avenue Safety Enhancement Project Fact Sheet March 2022.pdf FINAL
- Revision_2 US50_Flyer
- US50 CMP - Existing Conditions Memo_No_App
- US50 CMP - Ex Cond Takeaways
- NDOTUS395_ProjUpdate_2021 FINAL
- Appendix H (1)
- Appendix G
- Appendix F (1)
- Appendix E Combined
- Appendix D Combined
- Appendix C Combined_reduced
- Appendix A Combined (1)
- Appendix B Combined
- NDOT_I-15 Flamingo-Sahara Feasibility Study_July 2021_FINAL_082521
- 2021-09_NDOT I-15_PEL_Questionnaire_and_Checklist_FINAL
- NV I-515_Flier_Charleston final design
- US50_Flyer
- U.S. 50-Dayton fact sheet 5 10 2021 UPDATED
- 20200928 Winnemucca Interchanges LA FF
- I-15 Tropicana Fact Sheet August 2020
- I-15 Tropicana Interchange Phasing Narrative Memorandum 2 of 2
- I-15 Tropicana Interchange Phasing Narrative Memorandum 1 of 2
- I-15 Tropicana Interchange Phasing Narrative Memorandum -11-12-2019
- Fact Sheet July 9 2020
- 0145Trop FULL SET 062420
- nv-stip-2019
- tahoe basin const map 2020 8.5x11
- I-15 Tropicana EA - TSPR Final
- I-15 Tropicana EA - TIAR Final
- STIPFormalProcedureandGuid
- STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
- STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
- Handout Packet 11-15-19 rev2
- I-15-Tropicana public hearing public notice 11 19 2019 FINAL
- A I-15 Tropicana Appendix A Public Information Meeting Summaries
- D I-15 Tropicana Appendix D Change in Control of Access Request
- C I-15 Tropicana Appendix C NDOT Traffic and Construction Noise Analysis and Abatement Policy
- B I-15 Tropicana Appendix B SHPO Correspondence (1)
- 00c I-15 Tropicana Appendix B SHPO Correspondence
- EA I-15 Tropicana EA 10152019
- NDOT US395_Proj Update_2019 Summer_rev2
- I15 Tropicana Public Meeting 2 Meeting Packet FINAL
- I15 Tropicana Fact Sheet 9 2019
- Gemfield Groundbreaking Aug 2
- U.S. 395 North Valleys Fact Sheet Updated May 2019
- U.S. 395 North Valleys Citiens Advisory Board Presentation May 2019
- C:\Users\h9003mmm\Documents\Marketing Ideas\I-580 Exit Number Flyer
- NDOT US395_Proj Update_2019 Spring
- Safety and Operational Improvements for US 50 Phase 2
- ONYX-BOWERS-Display
- US 50 Display from Roys Road to Hackberry Street
- US 50 Display from Hackberry Street to Silver Springs
- Roundabout at Silver Springs
- I-11 PEL Questionnaire and Checklist_02-01-19
- I-11 Executive Summary 2018
- December 2018 Alternatives Analysis Report
- December 2018 I-11 Public Outreach Summary
- C:\Users\h1003aep\Desktop\I-15 CC215 Welcome Packet
- C:\Users\h1003aep\Downloads\NDOT I-15 CC215 N Phase 4 Public Meeting PPT_12-4-18
- C:\Users\h1003aep\Downloads\I-15 CC215 Welcome Packet
- Draft I-11_PEL_Questionnaire_and_Checklist_Questionnaire_11-11-18
- I-11 Stakeholder Meeting October 2018 Webinar Slides
- I-11 Resource Agency Meeting October 2018 Webinar Slides
- Preliminary I-515 Southband Lane Drop Elimination & Auxiliary Lane Renderings
- C:\Users\h1003aep\Desktop\SB 515 lane drop
- SR 28 Closure Flyer
- I-11 NNAA_Public Outreach 2018_v24
- Appendix A -11 NNAA Outreach Summary DRAFT - October 2018
- I11NNAA_Alternatives Analysis_2018-10-08
- Appendix G - I11 NNAA - Implementation Strategies
- C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
- C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
- I-11_NNAA_Board_Summer2018_AlternativesMap
- I-11 NNAA_Public Outreach 2018_v17
- I-11 NNAA - Pub Mtg 2 Handout
- FFY19 STIP Process DRAFT_AugBoard_7-18-2018
- I11NNAA_Alternatives Analysis Memo-DRAFT_2018_07_18
- AppF_I11NNAA_Connectivity-North-I80
- AppE_I11NNAA_EnvironmentalDetails
- AppD_I11NNAA_Transportation_Plans
- AppC_I11NNAA_Impacts-of-Bypasses
- AppB_I11NNAA_ED-questionnaire
- Ely Fact Sheet July 2018
- I-11 Meeting Flyer
- I-11 Frequently Asked Questions - June 2018
- I-11 NNAA_Methodology Memo March 2018
- I11NNAA_PublicOutreach2018
- I-11 NNAA_Impacts of Bypasses_2018-05
- I-11 NNAA_Connectivity North I-80_2018-05
- I-11 NNAA - Phase 1 Outreach Summary-Draft
- Birds Eye View of Starr Interchange
- Tahoe Basin Construction Information
- NDOT Nellis Road Improvement Project FAQ 2018
- NDOT Nellis Road Improvement Project DRAFT of PI Plan
- 07. Map Board_031618
- 06. I-11_NNAA_Alt Corridors Plot
- 05. I-11 NNAA - Pub Mtg 1 Handout
- 04. I-11 NNAA_Presentation - Public Mtg 1 Slides
- 03. I-11 NN PEL - Stakeholder Mtg 1
- I-11 NNAA_Public Outreach 2018_v130
- DRAFT of I-11 North NV - Methodology Memo - 2018-03-02
- Garnet Interchange Fact Sheet 2018
- final I-15 Tropicana Fact Sheet
- Final Report 12-30-2015
- Appendix 9 – TDI 3 Levels – DM TDI ALT1_BASE_CONFIGA1_36x48
- Appendix 8 – I-15_Tropicana Traffic Report_Interchange Analysis-Final Report122915 signed
- Appendix 7 – I-15 Tropicana Alternatives Selection Meeting
- Appendix 6 – I-15 Tropicana Alternatives Screening Meeting
- Appendix 5 – Tropicana Exit Concept Memo FINAL
- Appendix 4 – Interim Concepts Memo Review 9-21-15 Final
- Appendix 3 – Initial Concepts Report FINAL
- Appendix 2 – Traffic Forecasting Memorandum (Methodology Memo attached)
- Appendix 1 – CORSIM Calibration Memo (Methodology Memo in Attachment 1)
- Appendix 17 – I-15-Tropicana_PEL_Questionnaire_and_Checklist_Nevada_v5
- Appendix 16 – Golden Palm
- Appendix 15 – Public Open House Summary
- Appendix 14 – Public Meeting Materials
- Appendix 13 – Public Open House Advertisements
- Appendix 12 – Fact Sheet
- Appendix 11 – Seering Committee Meeting Minutes
- Appendix 10 – TDI 3 LEVEL TROP FINAL 2015 WIZARD SUMMARY
- NDOT_NWcorrPh3A-3E_improv_handout_20170927
- NDOT_NWcorrPh2B-5_improv_handout_20170928
- FTA Transit NDOT 3 Year Goal Methodology 2017
- USAPkwy_FactSheet[10] Spring 2017
- USA Parkway PerspectiveViews
Project Neon Phase 2
Project Overview
Project Neon Phase 2 is the second, and final, phase of Project NEON. The focus of this project is to complete an I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The project also includes reconstruction of the I-15/Sahara interchange and improvements to I-15 southbound between Sahara Avenue and Spring Mountain Road.
This project will alleviate congestion on I-15 northbound from Sahara Avenue to the I-15/US 95 “Spaghetti Bowl” and improve I-15 movements critical to local, regional, and national economies.
Project Area
The project is located on I-15 between Sahara Avenue and the I-15/US 95 “Spaghetti Bowl” interchange.
Project Elements
Project NEON Phase 2 includes the following elements:
- I-15 northbound collector-distributor (CD) road to access US 95 northbound with access to MLK Boulevard and Alta Drive/Bonneville Avenue. The CD road will be braided with the Sahara Avenue on-ramp to I-15 northbound and the I-15 northbound off-ramp to Charleston Boulevard.
- Reconstruction of the I-15/Sahara Avenue Interchange.
- I-15 southbound lane improvements between Sahara Avenue and Spring Mountain Road.
Project Background
- Project NEON is the largest public works project in Nevada history. The design-build phase was completed in 2019. It widened 3.7 miles of Interstate 15 between Sahara Avenue and the Spaghetti Bowl interchange in downtown Las Vegas. It’s currently the busiest stretch of highway in Nevada with 300,000 vehicles daily, or one-tenth of the state population. Traffic through the corridor is expected to increase by 25 percent by 2050.
Schedule
The following schedule is preliminary and subject to change. For construction, the majority of the CD road improvements will be constructed without disruption to I-15 traffic.
Sign Up for Project Updates
Sign up for project updates here.
Documents
Project NEON_2010 FINAL EIS
Project NEON_2012 EIS Reevaluation
Project NEON_2015 EIS Reevaluation
Project NEON_Record of Decision
Contact
NDOT Project Manager:
Eric Scheetz, PE
escheetz@dot.nv.gov