Nevada Department of Transportation
Home MenuDocuments
- NDOT - Bridge G-772E Asbestos & Lead Paint Survey Report (FINAL)
- NDOT - Bridge G-765E Asbestos & Lead Paint Survey Report (FINAL)
- NDOT - Bridge B-1532 Asbestos & Lead Paint Survey Report (FINAL)
- NDOT - Bridge B-1531 Asbestos & Lead Paint Survey Report (FINAL)
- NDOT - Bridge B-303 Asbestos & Lead Paint Survey Report (FINAL)
- Intro to TNM-NDOT TNM 2.5 defaults-NoWatermark
- Sample- No NSA TN Clearance Memo
- Meter Setup
- Intro to TNM-NDOT TNM 2.5 defaults
- How to Conduct a Noise Measurement
- 2021 NDOT ESD Chapter 18 Emergency Procedures FINAL
- FINAL ENV Procedures Guide Chapter 13 - Noise December 2023 CLEAN
- NDOT_Inventory of Connectivity Needs_1Dec2023_Final_V1
- AB112_As_Enrolled_Final
- _Final PCE AGREEMENT 02_15_2022
- Bridge H-1162 EW survey
- Bridge 608 survey report
- 2022 Annual PA Report
- Appendix 5 Coyote Springs Public Outreach Plan
- Appendix 4 Coyote Springs Research Studies combined
- Appendix 3 Coyote Springs Planning Documents combined
- Appendix 2 Coyote Springs Cost Estimate and Funding Letters
- Appendix 1 Coyote Springs Letters of Support combined
- Coyote Springs 2023 WCPP Grant Application
- 74194 - Heavy metal reports_Verdi_Bridges
- Bridge 422 survey report
- Bridge 452 survey report
- NVDOT Latino History in Nevada - Flyer
- NDOT Latino History in Nevada - Introduction
- 3940 La Cruz survey
- 3936 La Cruz survey
- Bridge G-29 survey report
- 3932 La Cruz survey
- Bridge 581 survey report
- 10 Del Amo Survey Report
- MPDF_VictoryHwy
- MPDF_LincolnHwy
- Chapter 18-Emergency Procedures
- Bridge 1442 survey report
- NV18-036+NV18-037-20210504 Lincoln and Victory Hwy Concurrence
- Bridge 1412 survey report
- Bridge 1443 survey report
- Bridge 571S survey report
- Bridge 571N survey report
- Bridges 974 NS survey report
- Bridges 973 NS survey report
- Bridges 1109 NS survey report
- FEIS_Appendix_E_Agency_Public_Involvement
- FEIS_Appendix_E_Agency_Public_Involvement
- FEIS_Appendix_D14_IndirectCumulativeReport
- FEIS_Appendix_D14_IndirectCumulativeReport
- FEIS_Appendix_D13_CulturalResources_AOE_Part2
- FEIS_Appendix_D13_CulturalResources_AOE_Part2
- FEIS_Appendix_D13_CulturalResources_AOE_Part1
- FEIS_Appendix_D13_CulturalResources_AOE_Part1
- FEIS_Appendix_D12_Hazardous_Material
- FEIS_Appendix_D11_Veg_Wildlife_Fish_Report
- FEIS_Appendix_D10_Biological_Opinion
- FEIS_Appendix_D09_Drainage_Design_Report
- FEIS_Appendix_D08_Aquatic_Resource_Inventory
- FEIS_Appendix_D07_Visual_Impact_Assmt_Report
- FEIS_Appendix_D06_AirQuality_Report
- FEIS_Appendix_D05B_Highway_Traffic_Noise_Report
- FEIS_Appendix_D05A_Pref_Alt_Traffic_Noise
- FEIS_Appendix_D04_Environmental_Justice
- FEIS_Appendix_D03_RelocationImpactAnalysis_Part2
- FEIS_Appendix_D03_RelocationImpactAnalysis_Part1
- FEIS_Appendix_D02_Community Impacts Report
- FEIS_Appendix_D01_Impact_Assessment_Methodologies
- FEIS_Appendix_C_Traffic_Analysis_Report
- FEIS_Appendix_H_CCOAreport_Part3
- FEIS_Appendix_H_CCOAreport_Part2
- FEIS_Appendix_H_CCOAreport_Part1
- FEIS_Appendix_G_RTC_Part3
- FEIS_Appendix_G_RTC_Part2
- FEIS_Appendix_G_RTC_Part1
- FEIS_Appendix_F3_F4_F5
- FEIS_Appendix_F2_Part2
- FEIS_Appendix_F2_Part1
- FEIS_Appendix_F1
- FEIS_Appendix_B2_Design_Report_Part9
- FEIS_Appendix_B2_Design_Report_Part8
- FEIS_Appendix_B2_Design_Report_Part7
- FEIS_Appendix_B2_Design_Report_Part6
- FEIS_Appendix_B2_Design_Report_Part5
- FEIS_Appendix_B2_Design_Report_Part4
- FEIS_Appendix_B2_Design_Report_Part3
- FEIS_Appendix_B2_Design_Report_Part2
- FEIS_Appendix_B2_Design_Report_Part13
- FEIS_Appendix_B2_Design_Report_Part12
- FEIS_Appendix_B2_Design_Report_Part11
- FEIS_Appendix_B2_Design_Report_Part10
- FEIS_Appendix_B2_Design_Report_Part1
- FEIS_Appendix_B1_Initial_Concepts_Report
- FEIS_Appendix_A_Existing_Freeway_Conditions_Report
- 22_FEIS_Index
- 21_FEIS_Chapter 6 Section 4f Evaluation
- 20_FEIS_Chapter 5 List of Preparers
- 19_FEIS_Chapter 4 Public Involvement
- 9_FEIS_Section 3.5 Air Quality
- 8_FEIS_Section 3.4 Traffic Noise
- 7_FEIS_Section 3.3 Environmental Justice
- 6_FEIS_Section 3.2 Community Resources
- 5_FEIS_Section 3.1 Introduction
- 4_FEIS_Chapter 2 Alternatives
- 3_FEIS_Chapter 1 Project Need
- 2_FEIS_Executive Summary
- 18_FEIS_Section 3.14 Commitments of Resources
- 17_FEIS_Section 3.13 Uses Versus Productivity
- 16_FEIS_Section 3.12 Indirect and Cumulative
- 15_FEIS_Section 3.11 Cultural Resources
- 14_FEIS_Section 3.10 Hazardous Materials
- 13_FEIS_Section 3.9 Vegetation Wildlife Fish
- 12_FEIS_Section 3.8 Water Resources
- 11_FEIS_Section 3.7 Visual Character
- 10_FEIS_Section 3.6 Transportation Services
- 1_FEIS_Front Matter
- _FEIS_Cover Signature Abstract
- Bridge 2845 survey report
- Bridge 333 survey report
- MPDF_VictoryHwy
- MPDF_LincolnHwy
- 2019 NDOT PA Annual Report
- C:\Users\kchmura\Documents\2018 MS4 Permit SWMP Plan_Final_March 2020_Web_R
- C:\Users\kchmura\Documents\_I-15_Tropicana_FONSI
- Appendix_D_Change_in_Control_of_Access_Report
- Appendix_C_NDOT_Traffic_Noise_Policy
- Appendix_B_SHPO_Correspondence
- Appendix_A_Public_Information_Meeting_Summary_Reports
- I-15_Tropicana_EA
- C:\Users\kchmura\Documents\NV Wildlife Considerations Summit 10-15-19 Summary
- C:\Users\kchmura\Documents\FY2019 SWMP Annual Report_Final_All_R
- C:\Users\kchmura\Documents\NV summit final attendees list
- C:\Users\kchmura\Documents\NV Wildlife PPTs-compressed
- C:\Users\kchmura\Documents\Final Agenda
- C:\Users\kchmura\Downloads\_I-515 Charleston FONSI FINAL_09192019
- _I-515_Charleston_Blvd_EA_May2019
- I-515 Charleston EA_AppD Community Involvement
- I-515 Charleston EA AppC Tech_Reports_05012019
- Charleston_I515_EA_AppB Alternatives Report
- Charleston_I515_EA_AppA Agency Coordination
- C:\Users\kchmura\Documents\StormwaterPollutionPrevent
- Documenting NOA and Erionite in Import Material from Non-Nevada DOT Sources for Projects 2.2019
- 2018 Annual Report
- 2018 Annual Report
- Record of Decision
- 01_Pyramid ROD - FINAL 12072018
- Transportation Right of Way Markers
- Chapter 13 -Traffic Noise.pdf
- Chapter 13 - Traffic & Construction Noise
- Documenting NOA and Erionite in Import Material for Nevada Department of Transportation Projects
- Noxious Weed Checklist-Plan Form
- Appendix F Traffic Sensitivity Tech Memo 042018
- Appendix E Sage Grouse BLM RDF Analysis
- Appendix D DEIS Comments and Resps-red
- Appendix C Pref Alt 3 plans_red
- Appendix B Public Inv
- Appendix A Agency Coord - Part 2 red 2
- Appendix A Agency Coord - Part 1 red 2
- 009_Chapters 7 - 10
- 008_Chapter 6 - Eval of Alts
- 007_Chapter 5 - Section 4f
- 006_Chapter 4 - Comments Coord
- 005_Chapter 3 - Env Resources
- 004_Chapter 2 - Alternatives
- 003_Chapter 1 - Purpose and Need
- 002_Executive Summary
- 001_Front Matter Table of Contents
- 000_FEIS Combined File
- NDOT Traffic and Construction Noise Analysis and Abatement Policy 15 May 2018.aa
- Environmental Services Procedures Guide
- ESD Procedures Guide Cover
- Preface
- Chapter 1-Organization
- Chapter 2-Project Development
- Chapter 3-Categorical Exclusions
- Chapter 4-Environmental Assessments
- Chapter 5-Environmental Impact Statements
- Chapter 6-Public Involvement Process
- Chapter 7-Section 106
- Chapter 8-Section 4(f)
- Chapter 9-Socio-Economics
- Chapter 10-Threatened & Endangered Species
- Chapter 11-Material Sites
- Chapter 12-Air Quality
- Chapter 14-Hazardous Materials & Waste
- Chapter 15-Other Environmental Analyses & Permits
- Chapter 16-Environmental Justice
- Chapter 17-NOA & Erionite
- Appendix A-Acronyms
- Appendix B-Directives & Guidance
- 2015 NDOT PA Annual Report
- nvfhwafederalaidhighwaypro-2017extension
- Revised 171027_MPDF
- 2017 Annual Report
- 2016 Annual Report
- C:\Users\H9070krr\Desktop\NDOT Traffic and Construction Noise Analysis and Abatement Policy Eff July 2011 Last Rev 01 Dec 2017
- NDOT Traffic and Construction Noise Analysis and Abatement Policy Eff July 2011 Last Rev 01 Dec 2017
- Program Comment Bridge List
- Bridge Program Comment
- Project_NEON_02_FEIS
- NEPA_US_95_Final_EIS_Vol_3
- NEPA_US_95_EIS_Vol_2
- NEPA_US_95_EIS_Vol_1
- BC_Bypass_01_FHWA_NV_FEIS_00_02_Vol_1
- ROD_FEIS_Pyramid_and_McCarran_Int
- Appendix A_Alignment Map_USA Parkway EA reduced
- US 95 NW EA Reevaluation 73013
- SR 160 Environmental Assessment with Errata (FHWA-NV-EA 13.01)
- SR 160 Environmental Assessment Finding of No Significant Impact (FONSI)
- Project_NEON_03_2012_Reevaluation_Final
- Project_NEON_01_ROD
- NEPA_EA_09_01_LkMeadPkwy
- NEPA_EA_07_02_I15South
- NEPA_EA_07_01_95NW
- NEPA_EA_06_01_I15North
- FONSI and EA_I_15_Interchange_Milepeost_118_Mesquite
- Categorical Exclusions Programmatic Agreement
- BC_Bypass_05_Tolling_2013_ReEvaluation_Final
- BC_Bypass_04_Reevaluation_2011_Final
- BC_Bypass_03_ReEvaluation_2009_Final
- BC_Bypass_02_FHWA_NV_FEIS_00_02_Vol_2
- BC_Bypass_00_ROD
- Appendix L_Public Scoping Comments_USA Parkway
- Appendix K_Intent to Study Ltr_USA Parkway EA
- Appendix C_EJ Tech Memo_USA Parkway EA
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.