Nevada Department of Transportation
Home MenuDocuments
- November NBPAB Agenda
- In Kind Match Guidance Draft -WEB-04192024
- TA Set Aside Fact Sheet What's Next-WEB-04192024
- TAP Agreement Amendment Process-WEB-04192024
- TA Procurement Requirements-WEB-04192024
- JUNE 26 SPECIAL MEETING AGENDA
- MAY 23 AGENDA
- 1NBPAB_ContactList_MARCH_2023
- NBPAB_ContactList_MARCH_2023
- TA_SetAside_FAQs_3.9.23
- NAHSP-Table Of Contents_DIGITAL
- NAHSP-Final-Technical-Report_DIGITAL
- DigitalCover_TechnicalReport_NASP
- Digital_NAHSP_ExecutiveSummary
- Appendix-B-Airport-Replacement-Values
- Appendix-A-Individual-Airport-Reports-1
- Chapter 9-Airport-Economic-Impact-Study
- Chapter 8-Recommendations-and-Investment-Needs
- Chapter 7-Existing-and-Future-System-Performance
- Chapter 6-Forecasts-of-Aviation-Demand
- Chapter 5-Airport-Regional-Value-Methodology
- Chapter 4-State-Regional-and-Local-Airport-Issues
- Chapter 3-Airport-Roles-and-Classification-Analysis
- Chapter 2-Inventory-of-Aviation-System-Conditions
- Chapter 1-System-Goals-and-Performance-Measures
- 2023_03_16_FINAL_AGENGA
- 2023 TA Application Guidance 2.14.23
- 2023 TA Application Guidance 2.13.23
- 23_PLNG TA Application Step By Step Guide.docx 2-13-23
- 23_NON_INFRA TA Application Step By Step Guide.docx 2-13-23
- 23_INFRA TA Application Step By Step Guide.docx 2-13-23
- 2NON TA Application Step By Step Guide.docx NON-INFRASTRUCTURE 2-8-23
- FED_ta_guidance_2022
- 2023 TA Application Guidance_2
- PLANNING TA Application Step By Step Guide.docx 2-6-23
- NON TA Application Step By Step Guide.docx 2-6-23
- INFRA TA Application Step By Step Guide.docx 2-6-23
- TA Application Step By Step Guide.docx PLANNING 1-23-23
- TA Application Step By Step Guide.docx NON-INFRASTRUCTURE 1-23-23
- TA Application Step By Step Guide.docx INFRASTRUCTURE 1-23-23
- NBPAB_JAN_23
- 2023 TA Application Guidance
- TA_SetAside_FactSheet_2023
- Contact List
- January Agenda
- SUMMIT 22
- SAVE THE DATE 22
- July Agenda
- July 22 Agenda
- NBPAB MAY22
- NBPAB MAY22
- March 22 Agenda
- January Agenda
- Nov 21 Agenda
- NOV 21 Agenda
- September Agenda
- NBPAB 07_21
- July Agenda
- TALLY SHEET 21
- Tally sheet
- 2105 Agenda
- MARCH Agenda special meeting
- 1803 Agenda
- ELKO_OVERVIEW
- ELKO_CO_WELLS
- ELKO_CO_W_WENDOVER
- ELKO_CO_SPRINGCREEK
- ELKO_CO
- ELKO_CO_OVERVIEW2
- ELKO_CO_ELKO
- ELKO_CO_CARLIN
- LINCOLN COUNTY OVERVIEW
- LINCOLN COUNTY - PIOCHE
- LINCOLN COUNTY - PANACA
- LINCOLN COUNTY - CALIENTE
- LINCOLN COUNTY - ALAMO
- PERSHING MAPS Lovelock
- PERSHING MAPS Lovelock
- PERSHING MAPS Overview
- PERSHING_MAPS_LOVELOCK_2
- PERSHING_MAPS_LOVELOCK
- PERSHING OVERVIEW
- 2103 Agenda PDF
- WHITEPINE-37
- WHITEPINE-36
- WHITEPINE-35
- WHITEPINE-34
- WHITEPINE-33
- WHITEPINE-32
- WHITEPINE-17
- WHITEPINE-13
- PERSHING_MAPS_ONLY
- MINERAL-31
- MINERAL-30
- MINERAL-13
- LINCOLN_MAPS_ONLY
- LANDER3
- LANDER2
- LANDER1
- ESMERALDA-31
- ESMERALDA-30
- ESMERALDA-13
- DOUGLAS-38
- DOUGLAS-37
- DOUGLAS-36
- DOUGLAS-35
- DOUGLAS-34
- DOUGLAS-33
- DOUGLAS-18
- DOUGLAS-14
- CHURCHILL-36
- CHURCHILL-35
- CHURCHILL-34
- CHURCHILL-19
- CHURCHILL-18
- CHURCHILL-14
- 2016-06-28 Lyon County Bike Plan-40
- 2016-06-28 Lyon County Bike Plan-39
- 2016-06-28 Lyon County Bike Plan-38
- 2016-06-28 Lyon County Bike Plan-37
- 2016-06-28 Lyon County Bike Plan-36
- 2016-06-28 Lyon County Bike Plan-35
- 2016-06-28 Lyon County Bike Plan-20
- 2016-06-28 Lyon County Bike Plan-19
- 2016-06-28 Lyon County Bike Plan-14
- 2016-06-27 Nye County Bike Plan-36
- 2016-06-27 Nye County Bike Plan-35
- 2016-06-27 Nye County Bike Plan-34
- 2016-06-27 Nye County Bike Plan-33
- 2016-06-27 Nye County Bike Plan-32
- 2016-06-27 Nye County Bike Plan-17
- 2016-06-27 Nye County Bike Plan-13
- 2016-06-21 Humboldt County Bike Plan-32
- 2016-06-21 Humboldt County Bike Plan-31
- 2016-06-21 Humboldt County Bike Plan-16
- 2103 Agenda
- 2103 Agenda
- NBPAB Agenda 3/21
- Application Ed Grant 2021
- Tahoe-Pyramid Bikeway Closure
- January Agenda
- Board Members_2020
- September 2020 Agenda
- TIP CARDS
- July Agenda
- May Agenda
- ContactList_April_2020
- Pedestrian crossword
- Pedestrian crossword
- Pedestrian crossword
- PEDESTRIAN SAFETY WORD SEARCH (003)
- Bicycle Safety Word Search
- WalkandRollNV scavenger hunt
- Bicycle and Pedestrian Walk and Roll Wednesday Launch 2020 Release
- 2020_NV_TAP Guidance 1
- 2020_NV_TAP Guidance 1
- 2020_NV_TAP Guidance 1
- 2020_NV_TAP Guidance
- PLANA PowerPoint Slides 2017
- NV Moves ELT Update
- TAP_Scoring_Criteria_Non_Infrastructure
- TAP_Scoring_Criteria_Infrastructure
- TAP_Scoring_Criteria_Non_Infrastructure
- TAP_Scoring_Criteria_Infrastructure
- AGENDA_PG3
- AGENDA_PG2
- AGENDA_PG1
- Eligible Projects
- 2021_2022_NDOT_TAPGuidance_.doc
- 2021_2022_NDOT_TAPGuidance_.doc
- 20162018TAPProjectList
- SUMMIT 2019 FLYER
- 1909 agenda
- Contact List_February_2019
- July Agenda
- May Agenda
- Contact List_February_2019
- 1901 agenda_WS_lfh rev (002)
- Bicycle-Pedestrian Funding Available 2019 Press Release
- FOR IMMEDIATE RELEASE_STRFUNDING
- Application_Ed_Grant_2019
- November Agenda
- 1809 agenda_lfh rev
- Contact List_September_2018
- July Agenda
- ADULTBIKE_FAQ_VER2.0
- May Agenda
- March Agenda
- Contact List_January_2018
- 1801 agenda rev(002)_lfh rev
- September NBPAB Agenda
- Application_Ed_Grant_2017
- 2017 Bike Week Proclamation
- 14 Members
- Contact List .November2016PDF
- Restricted Areas
- Restricted Areas List
- Contact List November 2016
- March Agenda
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.