Nevada Department of Transportation
Home MenuDocuments
- Newsletter Archives
- Media Downloads
- Transportation Planning
- ADA Transition Plan 2023
- Rest Area Map 2024 October
- I-80 Repaving West of Reno Web Site Text
- 2023- ANNUAL REPORT fin--Draft_9_9_2024_updated
- Coyote Springs 2024 WCPP Project Narrative
- Coyote Springs 2024 WCPP Project Abstract
- Appendix 5 Public Outreach Plan
- Appendix 3 Planning Documents Combined
- Appendix 2 Cost Estimate and Funding Commitment Letters
- Appendix 1 Letters of Support
- Appendix 4 Research Studies Combined
- 2023- ANNUAL REPORT fin--Draft_8_19_2024
- 2024 Tahoe Basin Construct
- Technical Memo #4 - Implementation Plan_ITS_ATM_MasterPlan
- Technical Memo #2 - Needs and Gaps_ITS_ATM_MasterPlan
- Technical Memo #3 - Deployment Recommendations_ITS_ATM_MasterPlan
- Technical Memo #1 - Existing Conditions and Inventory_ITS_ATM_MasterPlan
- Executive Summary_ITS_ATM_MasterPlan
- Executive Summary Presentation_ITS_ATM_MasterPlan
- IT Standards v3 Final
- NDOT Certified TAMP 052422_updated_2024
- Data_Governance_Policy_TP_3-11
- NBPAB July Agenda
- 2024_07_18_Agenda
- Wizard Tool_06-27-24
- Wizard Project Estimation Tool_20240606
- 2024 Tahoe Basin Construction Map
- Vol_2_US50 CMP - Technical Documents
- Vol_3_US50 CMP - Rnds 1-6 Outreach Summary
- US50_East_Shore_CMP_Final
- Corridor Plan - Volume 1_Final_reduced
- SR 160 and SR 159 PIM 2 - Exhibits_reduced
- SR 160 and SR 159 PIM 1 - Exhibits_reduced
- PIM#1 Presentation for Website
- PIM Meeting #2 Handouts
- PIM Meeting #2 - Presentation_v4
- Fact Sheet
- 2023- ANNUAL REPORT fin--Draft
- 2024_03_21_Agenda
- Bicycle and Pedestrian Contact Information
- US50 CMP - Final Report DRAFT
- US50 CMP - Final Report Vol 3_DRAFT
- US50 CMP - Final Report Vol 2_DRAFT
- NDOT NEVI Public Webinar Presentation_1.24.24
- 2024_01_18_AGENGA
- 2024 DI - WORKING COPY - Final
- Performance Management Report 2023 Final
- Milepost and Districts 202_2023map
- LV FSP Routes Effective 11-24-23_freewaysafety
- 2023_11_16_agenda
- 2023_11_16_agenda_NBPAB
- NevadaFreightPlanUpdate_FI_2023
- Freight Investment Plan 20_2023
- 2023 CUFC CRFC Acceptance
- Politcal Sign Brochure_2023
- NDOT Certified TAMP 052422
- 2023 STATE PRESERVATION REPORT_2
- bicycle ped meeting
- 020096 Certificate of Comp
- 020095 Certificate of Mate
- 2023_09_21_NBPAB_Agenda
- 2023 0914 NVACTS Agenda
- ContactList_August_2023
- 2022 Annual Report
- Notice for Public Meeting - The Downtown Access Project
- July 20 AGENDA
- July 20 AGENDA
- NDOT NEVI Public Webinar Presentation_slides
- NDOT NEVI Public Webinar Presentation_7.12.23
- Title VI Complaint Procedures - Spanish
- Title VI Notice spanish
- Title VI Complaint Form Spanish
- NATAC AGENDA 07.20.pdf
- Notice for Public Meeting - SR 361 Roadway Realignment Project
- Notice for Public Meeting - SR 361 Roadway Realignment Project
- Notice for Public Meeting - I-80 Carlin & Elko Landscape & Aesthetics Projects
- JUNE 26 SPECIAL MEETING AGENDA
- Flyer_NDOTTransitPlan_v6 (1)
- 20191230 TRIC Circulation
- Goods Movement Study 2000
- 20190530 Tech Memo 3 with
- 20190212 Tech Memo 2
- 20181101 Tech Memo 1
- Flyer_NDOTTransitPlan_v6
- 20191230 TMA Executive Sum
- NDOT NEVI FAQ - Spanish Translation
- 2023 0608 NVACTS Agenda
- NOTICE FTA DBE Goal
- LV FSP Routes Effective 01-01-23
- Tribal-Chairs-and-Organizations-for-website-5
- Part 10_Appendix G though M_US 50 Operational Study Final Report
- Part 9_ Appendix F IHSDM Safety Analysis_US 50 Operational Study Final Report
- Part 8_Appendix C through E_US 50 Operational Study Final Report
- Part 7_Appendix B Crash Data & Crash Charts_US 50 Operational Study Final Report
- Part 6_Appendix 8 2040 Controlled Access Alternative Synchro Output_US 50 Operational Study Report
- Part 5_Appendix 5 through 7_US 50 Operational Study Final Report
- Part 4_Appendix 2 through 4_US 50 Operational Study Final Report
- Part 3_Appendix 1 Traffic Report_US 50 Operational Study Final Report
- Part 2_Appendix A Traffic Report_US 50 Operational Study Final Report-2
- Part 1_US 50 Operational Study Final Report
- NDOT NEVI FAQs
- NATAC-2023-FINAL
- NATAC-2023-Agenda
- NDOT Transporttion Planning for NonMetropolitan and Tribal Consult Process June2021
- 2023 0309 NVACTS Agenda
- Study Process Graphic
- Speed Management Action Plan
- BytheNumbers_02
- BytheNumbers_01
- Fact_Sheet_Spring_2020_Final
- Online-Meeting-E-blast-Final-7-28-20_reduced
- I-11-Environmental-Impact-Public-Meeting-Website-Launches-July-31
- Tier-1-vs-Tier-2-1
- NDOT-I-11-Tier-1-EIS-RevDraft-Purpose-and-Need-Statement-4-23-20
- NEPA-Graphic
- NDOT-I-11-Tier-1-EIS-FAQ-April-2020-Final-REV
- NDOT_I-11_PEL_Fact_Sheet_2-SIDED_June2022_Spanish_PDFUA
- NDOT_I-11_PEL_FAQ_Accessible_20220622_Spanish_PDFUA
- NDOT-I-11-PEL_Appendix-C-Agency-Coordination-and-Public-Involvement-Summary
- Appendix B_NDOT I-11 Alternatives Development Report_April 2022
- Appendix A_Conditions Assessment Report_April 2022
- NDOT I-11 Draft PEL Report_ May 2022
- NDOT I-11 Final PEL report
- Upper Clear Creek Compiled Data Set
- NATAC AGENDA
- Lower Clear Creek Compiled Data Set
- 2022 1208 NVACTS Agenda
- SR 169 Fact Sheet Handout
- Waterline Road
- Schedule and Impacts
- Project Details
- Project Description and Purpose
- Project Area
- SR 169 PIM Meeting_Final
- AWG Meeting #10
- 10.27 Canvassing Tour Documents
- PostcardMailer (002) final
- US50 CMP - Future Scenarios_Final
- Henderson Interchange project-FONSI transmittal 20221011
- FAQ_Spanish FINAL 10-6-2022
- FAQ_English FINAL 10-6-2022
- FactSheet_Spanish_v3 FINAL 10-6-2022
- FactSheet_English_v4 FINAL 10-6-2022
- FAQ_Spanish FINAL 10-6-2022
- FAQ_English FINAL 10-6-2022
- FactSheet_Spanish_v3 FINAL 10-6-2022
- FactSheet_English_v4 FINAL 10-6-2022
- AWG Meeting #9
- 2022 0908 NVACTS Agenda
- Henderson Interchange Public Hearing Notice_08.18
- NEVI_Plan_NevadaDOT_FINAL_072822
- Agenda June 14 2022 AWG Meeting #8
- NDOT 2023-25 Triennial DBE Goal Presentation Public Meeting Notice (002)
- 2022 0609 NVACTS Agenda
- 10 Appendix E Section 4f Correspondence
- 09 Appendix D Traffic Noise Report_Combined
- 08 Appendix C SHPO Correspondence_Combined
- 07 Appendix B Public Outreach Materials_Combined (1)
- 06 Appendix A Alternatives Analysis Report_Combined
- 01-05 Henderson Interchange EA_05202022
- NDOT 2021 Disparity Study Presentation Public Meeting Notice
- 2022 0414 NVACTS Agenda
- Agenda April 12 2022 AWG Meeting #7
- 2022 0323 Leg Task Force Agenda
- 2021 Facts and Figures
- 2021 ANNUAL REPORT
- Agenda March 8 2022 AWG Meeting #6
- Latino study flyer 2022
- 2022 0201 NVACTS Agenda
- Agenda January 11 2022 AWG Meeting #5_20211203_v01b
- Political Signs Brochure 2022
- NHS_Maps_Reno_Area_Coverage_2022
- NHS_Maps_Las_Vegas_Area_Coverage_2022
- NHS Routes 2022
- safety brochure copy
- 2021 1130 NVACTS Agenda
- Agenda November 9 2021 AWG Meeting #4_20211031
- 2021 1021 NVACTS Agenda
- Agenda September 14 AWG Meeting #3_20210820
- 2021 0817 NVACTS Agenda Public
- AWG Agenda August 10 Meeting #2
- Online-only AWG Kickoff Meeting Agenda July 13 2021
- Online-only AWG Kickoff Meeting Agenda July 13 2021
- I-15 Speedway map
- AWG Draft Ground Rules and Operating Procedures_v03b.HH
- Stormwater Brochure with map
- Round Hill Pines Access Project
- Round Hill Pines Project
- NECTS Agenda 05.04.2021
- Nevada Rail Plan Summit Public Comment 2021 Release
- DBE NOTICE
- RJ AD_SP
- RJ AD 515 eng
- Mt. Rose VPM Mailer
- 2021 0126 NECTS Agenda Updated_Public
- Centennial_Bowl__Phase3D_Fact-Sheet
- 3796 exit numbers updatedCAS
- Jones Open-Grade Notice
- 2011 NDOT Maintenance Customer Satisfaction Survey Report
- Directive-021-Phase-Two-Reopening-Plan
- tahoe basin const map 2020 8.5x11
- TROP US 95 EMAIL
- BOD 04_2020 Agenda 04092020
- C:\Users\h1003aep\Desktop\15 tropicana fact sheet 2 2020
- PoliticalSignsYourHighways2020Brochure
- C:\Users\h1003aep\Desktop\Gemfield Update Feb 4 2020
- C:\Users\h1003aep\Desktop\TROP FEB EMAIL
- C:\Users\h1003aep\Desktop\NDOT_Tropicana_Flyer Final Mailer
- 2021 State Highway Preservation Report
- C:\Users\h1003aep\Desktop\Henderson Interchange Project Sheet
- C:\Users\h1003aep\Desktop\Henderson Interchange Handouts Dec 5 2019
- C:\Users\h1003aep\Desktop\Henderson Presentation Dec 5 2019
- NDOT Trop-Fact Sheet OCTOBER 2019
- NDOT Trop-comment form FINAL
- C:\Users\h1003aep\Desktop\TROP OCT EMAIL
- C:\Users\h1003aep\Desktop\Gemfield Update Nov 4
- PoliticalSigns_YourHighways_2020Brochure
- NHS - 2020 - State Map
- C:\Users\h1003aep\Desktop\I15 Tropicana Fact Sheet 9 2019
- C:\Users\h1003aep\Desktop\Tropicana Ph II Flyer
- C:\Users\h1003aep\Desktop\TROPICANA AVE PUBLIC MTG PPT SEP 12 2018
- C:\Users\h1003aep\Desktop\TROPICANA AVE PUBLIC MTG PPT SEP 12 2018
- HOV Lanes in Las Vegas
- SNTS Executive Summary
- SNTS Final Report July
- C:\Users\h1003aep\Desktop\Gemfield_BLM_POD Revision_2017Mar20_fnl
- C:\Users\h1003aep\Desktop\GoldfieldDaysPosterFinal2019
- C:\Users\h1003aep\Desktop\SNTS Final Report Interactive July 2019
- C:\Users\h1003aep\Desktop\SNTS Final Report Interactive July 2019
- C:\Users\h1003aep\Desktop\SNTS Final Report Interactive July 2019
- C:\Users\h1003aep\Desktop\SNTS_ExecSummary_final_2019July07 Interactive
- C:\Users\h1003aep\Desktop\SNTS Final Report Interactive July 2019
- C:\Users\h1003aep\Desktop\SNTS_ExecSummary_final_2019July07 Interactive
- C:\Users\h1003aep\Desktop\SNTS_ExecSummary_final_2019July07 Interactive
- C:\Users\h1003aep\Desktop\SNTS Final Report Interactive July 2019
- C:\Users\h1003aep\Desktop\I-515 SB AUX Spring 2019_FRONT
- C:\Users\h1003aep\Desktop\I-515 Fact Sheet 05.20.19
- C:\Users\h1003aep\Desktop\NDOT Fully-Compliant TAMP_041019
- C:\Users\h1003aep\Desktop\Notifications_NEON_190419_DB
- C:\Users\h1003aep\Desktop\Notifications_NEON_190419_DB
- C:\Users\h1003aep\Desktop\Doc1
- C:\Users\h1003aep\Desktop\Doc1
- C:\Users\h1003aep\Desktop\Doc1
- C:\Users\h1003aep\Desktop\I15 Tropicana Fact Sheet April 2019
- C:\Users\h1003aep\Desktop\Charleston.GC closures
- C:\Users\h1003aep\Desktop\Henderson Interchange Handouts Mar 27
- C:\Users\h1003aep\Desktop\Nellis Materials combined
- C:\Users\h1003aep\Downloads\Q_I-515 Concept Report Exec Summary
- C:\Users\h1003aep\Downloads\Q_I-515 Concept Report Exec Summary
- C:\Users\h1003aep\Downloads\Q_I-515 Concept Report Exec Summary
- C:\Users\h1003aep\Downloads\P_I-15I_I-215 N Executive Summary
- C:\Users\h1003aep\Downloads\O_Public Involvement
- C:\Users\h1003aep\Downloads\Q_I-515 Concept Report Exec Summary
- C:\Users\h1003aep\Downloads\P_I-15I_I-215 N Executive Summary
- C:\Users\h1003aep\Downloads\O_Public Involvement
- C:\Users\h1003aep\Downloads\N_Eastern Bypass Analysis Memo
- C:\Users\h1003aep\Downloads\M_Cost Estimates
- C:\Users\h1003aep\Downloads\L_10% Design Sheets
- C:\Users\h1003aep\Downloads\K_Steering Committee Mtg Materials
- C:\Users\h1003aep\Downloads\J_PEL Report wAppendices_122818 (signed)
- C:\Users\h1003aep\Downloads\I_Alts Devt Workshop
- C:\Users\h1003aep\Downloads\H_Data Collection Plans
- C:\Users\h1003aep\Downloads\G_Infographic
- C:\Users\h1003aep\Downloads\F_Benefit Cost Analysis
- C:\Users\h1003aep\Downloads\F_Benefit Cost Analysis
- C:\Users\h1003aep\Downloads\E_Future Conditions Report wAppendices
- C:\Users\h1003aep\Downloads\D_Existing Conditions for Final Report wAppendix
- C:\Users\h1003aep\Downloads\C_Aimsun Calibration Report wAppendices
- C:\Users\h1003aep\Downloads\B_Traffic Ops M&A Memo wAppendices
- C:\Users\h1003aep\Downloads\A_Traffic Forecasting M&A
- C:\Users\h1003aep\Downloads\SNTS Final Report
- C:\Users\h1003aep\Downloads\Executive Summary
- C:\Users\h1003aep\Desktop\Mar_NDOT_Nellis Infographic_Update_ (002)
- NDOT Strategic Plan Sept 2018
- C:\Users\h1003aep\Desktop\I15 Trop-Fact Sheet 1 28 2019
- C:\Users\h1003aep\Desktop\Starr Fact Sheet 2019
- 2015 only HOV Plan
- 2018 AddendumHOV Plan-no appendices
- C:\Users\jblack\Desktop\2018 Appendices Only_print
- I-580 NV Energy Utility Closure Nov 2018 Map
- C:\Users\h1003aep\Desktop\NDOT I15 CC215 Interchange_Public Meeting Notice_Final
- C:\Users\h1003aep\Desktop\NDOT I15 CC215 Interchange_Public Meeting Notice_Final
- 2018 NDOT Strategic Plan
- C:\Users\h1003aep\Desktop\SB 515 lane drop
- C:\Users\h1003aep\Desktop\SB 515 lane drop
- C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
- C:\Users\h1003aep\Desktop\NDOT_Garnet_FactSheet_Summer2018_v2
- C:\Users\h1003aep\Desktop\US 95 NW Corridor 2017 FP AU - Final 3-30-18
- C:\Users\h1003aep\Desktop\financial plan update
- C:\Users\h1003aep\Desktop\Phasing Display 08-27-18
- C:\Users\h1003aep\Desktop\Public Meeting Handout 515 215 Restripe
- C:\Users\h1003aep\Desktop\Public Meeting Handout 515 215 Restripe 0818
- I-11 public meetings
- I-11 public meetings
- Political Signs on Your Highways Brochure July 2018
- NDOT_Garnet_FactSheet_Spring2018_v1
- I-515-Charleston_fct sheet_2018
- 2018-05-15 NECTS Agenda_Public
- FINAL 515 Concept Report_June 2017
- I-515 Public Meeting slides 0331
- Fact sheet FB 3-22
- C:\Users\h1003aep\Desktop\515 Web Updates\Dec 2017 updated timeline
- C:\Users\h1003aep\Desktop\US95NW 3A-3E Update_Sept 2017
- C:\Users\h1003aep\Desktop\US95NW 2B-5 Update_Sept 2017
- C:\Users\h1003aep\Desktop\US95NW 2B-5 Update_Sept 2017
- C:\Users\h1003aep\Desktop\US95NW 2B-5 Update_Sept 2017
- NDOT Complete Street Policy Update 2017-Final
- FINAL 515 Concept Report_June 2017
- C:\Users\h1003aep\Desktop\Appendix F - NDOT PEL Questionnaire
- C:\Users\h9003jrd\Desktop\Glendale Ave\Galletti&Rock Closures_v1
- SR28-Fact Sheet
- US395 ITS Project
- Tropicana bridges rendering
- C:\Users\h1003aep\Desktop\MLK-Oakey Spring 2017
- C:\Users\h9003jrd\Desktop\100 year anniversary web book
- C:\Users\h9003jrd\Desktop\100 year anniversary web book
- Environmental Assessment for I-15 South Corridor Improvement
- Rules of Practice 2-21-13
- I80Appendix D
- Southern Nevada HOV Plan - Appendix J
- Southern Nevada HOV Plan - Appendix A
- 2009_Aug_FundingOpp
- 2014 Washoe Freeway Update Report
- 2014 I 80 CSMP Study Report(2)
- I80_2014_Appendix_18
- I80_2014_Appendix_17
- I80_2014_Appendix_16
- I80_2014_Appendix_15
- I80_2014_Appendix_14
- I80_2014_Appendix_13
- I80_2014_Appendix_11
- I80_2014_Appendix_12
- I80_2014_Appendix_10
- I80_2014_Appendix_08
- I80_2014_Appendix_07
- I80_2014_Appendix_06
- I80_2014_Appendix_05
- I80_2014_Appendix_03
- 2012 State of Nevada Transportation Facts and Figures
- Reno 1
- Las Vegas
- Milepost Markers Explained
- or11012
- Truck Escape Ramp Brochure
- US93_CollaredDeerAnalysis_Hwy93
- Wildlife_Crossing_Brochure
- DeerMigrationTrackingMap_I-80CorridorNENevada
- Wildlife Warning Systems, Evaluation
- RumbleStripMapOct09
- dlbook
- teamsafe_rndabout
- RBbrochure
- Flashing Yellow Arrow Brochure 2013
- Southern Nevada HOV Plan - Appendices B through I
- SoNv HOV Plan Update Project Fact Sheet(1)
- WinterDrivingInfo
- 2014 Traction Devices Brochure
- Workzone_driving
- Rest Area Sponsorship Concepts-Background
- Rest Area Sponsorhip Overview Presentation
- Rest Area Maintenance Inventory List
- REST AREA INITIATIVE
- Signs_State
- Signs_Reno
- Signs_LasVegas
- R-W signs brochure 2013
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.