Nevada Department of Transportation
Home MenuDocuments
- LAS24R170769_Final Geotech Report_515 Flamingo Wall Repair
- 74191_I-80 Widening over Stoker Ave_Geotechnical Investigation_Oct 2023
- FINAL GIR_74217_B-608 Replacement - New Bridge Struture B-3338
- EA 74429 I-80 GolcondaSummit_Geotechnical Design Report_20230127
- US 395_Final Geotechnical Design Report_HDR_1-23-23
- SoundWall_Design_Memo_Rev1
- I-3262_MSE_Wall_Design_Memo_Rev0
- 74107 NDOT Geotechnical MSE Design Report
- 07 Geotechnical Report Phase 1B
- G_29_Report_Final_Signed
- 74308_I-15 South Phase 2 Sound Walls_Updated Final Geotechnical Evaluation Report_20220825 (1)
- 74272 Pyramid Hwy Geotechnical Investigation Report
- I-15_TCL_MP_70.7_to_71.9_Geotech_Data_Report_Rev0
- I-15_TCL_MP_64.4_to_66.1_Geotech_Data_Report_Rev0
- 74046 Fernley Seismic Retrofit Geotechnical Data Report
- 74267 I-515 Charleston Interchange_MSE ONLY_GEOTECH-DSigned
- 74267 I-515 Charleston Interchange_High Mast Lights and Signposts_GEOTECH-DSigned
- 74267 I-515 Charleston Interchange_Embankment and Soundwall_GEOTECH-DSigned
- 74267 I-515 Charleston Interchange_Bridges_GEOTECH-DSigned
- September, 28 2021
- August 10, 2021
- July 12, 2021
- July, 6 2021
- January 1989
- April 1984
- April 1968
- August 1969
- August 2001
- March 2, 2021
- December 2020
- March 30, 2020
- December 2020
- March 27, 2015
- August 2005
- August 2005
- August 2005
- November 2000
- May 1972
- May 1972
- August 2020
- July 2020
- December 2019
- March 2020
- September 2019
- January 7, 2020
- June 19, 2019
- February 2020
- November 14, 2019
- March 22, 2019
- March 22, 2019rep
- December 12, 2001
- November 2019
- November 2019
- June 1995
- July 2018
- August 1997
- September 2019
- August 2019
- August 2019
- May 13, 2019
- July 5, 2019
- June 2019
- January 2019
- February 2000
- March 2019
- May 1984
- March 2005
- October 1978
- September 25, 1964
- September 25, 1964
- April 1980
- July 1984
- June 1979
- May 1964
- November 1984
- April 1981
- March 1970
- June 3, 1964
- July 27, 1964
- December 19, 1963
- February 12, 2013
- November 2018
- August 23, 2018
- July 1, 2014
- December 2014
- July 3, 2014
- May 24, 2010
- July 15, 1999
- August 2012
- August 2018
- May 2018
- July 2018
- May 2018
- February 2018
- January 31, 2017
- November 2017
- December 2017
- August 2016
- August 23, 2013
- July 2017
- May 2017
- April 2017
- April 24, 2017
- May 23, 2016
- August 2010
- January 2017
- January 2017
- February 2015
- August 24, 2016
- January 2017
- January 2012
- September 15, 2010
- June 2016
- June 2016
- June 2016
- June 2016_2
- June 2016_1
- June 2016_
- October 2015_
- October 2015
- May 2015
- June 2016
- August 2016
- June 2015
- January 6, 2015
- January 2015
- August 31, 2015
- February 2015
- October 2014
- November 2014
- May 2014
- January 9, 2014
- December 2014
- September 2013_
- September 2013
- November 2013
- April 2014
- March 8, 2013
- March 2013_
- March 2013
- August 2013
- September 18, 2012
- September 12, 2012
- October 5, 2012
- November 2012
- May 18, 2012
- May 2012
- June 29, 2012
- July 24, 2012_
- July 24, 2012
- July 2012
- October 24, 2011
- October 11, 2011
- February 2012
- August 23, 2012
- April 2012
- November 2011_1
- November 2011_
- November 2011
- May 2011_1
- May 2011_
- May 2011
- March 2011_1
- March 2011_
- March 2011
- June 22, 2011
- June 2011
- January 3, 2011
- July 2011_
- July 2011
- September 2010
- September 2010
- September 15, 2010
- March 2010
- June 29, 2010
- June 2009
- June 17, 2009
- July 2010
- July 2009_
- January 2010
- July 2009
- January 13, 2009
- February 27, 2009
- December 9, 2009
- December 2009
- October 2008_
- September 2008
- October 2008
- April 2009
- 2009_
- 2009
- May 2008_2
- May 2008_
- July 2008_
- July 2008
- January 2008
- October 2006
- December 2, 2008
- August 2008_
- August 2008
- April 2007
- September 2005
- July 2006
- January 2006_
- January 2006
- August 2006
- October 2005
- May 2005
- July 2005
- August 26, 2005
- August 2005_3
- November 2004
- August 2005_2
- August 2005_1
- August 2005_
- August 2005
- March 2004
- July 2004
- February 2004
- December 2004
- August 2004
- November 2002
- December 2003
- December 2002
- April 2003
- April 2002_2
- October 2000
- April 2002_1
- April 2002_
- April 2002
- November 2000
- June 2000
- July 2000
- August 2000
- April 2000
- May 1999
- March 1996
- March 19 & 20, 1996
- June 8, 1999
- July 22, 1997
- September 1995
- November 18, 1993
- March 1, 1995
- February 1996
- February 1994
- March 1993_1
- March 1993_
- March 1993
- April 1993
- August 12, 1992
- March 1993_1
- March 1993_
- March 1993
- geo2014502_rep
- geo2008504_Report
- September 1985
- March 10, 1989
- June 2, 1989
- December 19, 1988_
- December 19, 1988
- October 1975
- November 1973
- May 1982
- July 1975
- February 1976
- geo2015502_rep (2)
- geo2015502_rep (1)
- geo2015502_rep
- geo2014501_rep
- geo2014003_rep
- slo2011008_rep
- slo2011003_rep
- slo2011002_rep
- geo2011501_rep
- geo2011010_rep
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 10 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Adding a High Occupancy Vehicle (HOV) lane in each direction between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Project Cost and Funding
The total cost for construction is $86 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024:
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025:
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.